Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Permit Number - TC-MDP-0823-01428

Inspection Description - ENGR Engineering Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
11/25/2024 ENGR Engineering Final Not Ready The landscaping is not complete. The basins are not complete. The grading in the back of the units are not complete.
11/27/2024 ENGR Engineering Final Partial Pass contractor needs to finish putting in the DG , DG back in the alleyway the downspouts needs to be moved, so it does not hit the sidewalk area. And the tree staking.
12/03/2024 ENGR Engineering Final Partial Pass Contractors good for TCO level four or building 18 needs to install two paddles of fencing on the south east quadrant of the building
12/12/2024 ENGR Engineering Final Partial Pass Okay for TCO level 4