Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
08/18/2023
Applicant:
Description:
2231 Sleepy Hollow Estates

Permit Reviews

Permit Number - TC-MDP-0823-01427
Permit Status: Complete
Permit Description: 2231 Sleepy Hollow Estates
Start Date Submittal Complete Date Status  
12/05/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/09/2024 REQUIRES RESUBMIT Review Details
09/07/2023 RESTAMP - RESIDENTIAL v.1 09/07/2023 APPROVED Review Details
08/18/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.1 08/25/2023 REQUIRES RESUBMIT Review Details
12/19/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 12/19/2024 APPROVED Review Details
01/24/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/24/2024 APPROVED Review Details
09/06/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.3 09/07/2023 APPROVED Review Details
08/31/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.2 08/31/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-0823-01427
Permit Status: Complete
Permit Description: 2231 Sleepy Hollow Estates
Date Description Comments
05/17/2023 Post-Installed Anchor Inspection Report is required.
12/17/2024 Post-Installed Anchor Inspection Report is required.
05/17/2023 Post-Tension Inspection Report is required.
05/17/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
12/19/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
05/17/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
12/19/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0823-01427
Permite Description: 2231 Sleepy Hollow Estates
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
11/19/2024 COT - RSME - Mechanical Final N/A Not Ready
11/19/2024 COT - RSEL - Electrical Final N/A Not Ready not ready
11/27/2024 COT - BULD - SWG Clearance N/A Not Applicable
11/27/2024 COT - RSPL - Gas Pressure Test N/A Not Applicable
11/25/2024 ENGR Engineering Final N/A Not Ready The landscaping is not complete. The basins are not complete. The grading in the back of the units are not complete.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0823-01427
Permit Description: 2231 Sleepy Hollow Estates
Total Completed Inspections - 20
Date Description Inspector Results Comments
02/06/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading is required. 2/6/2024
02/20/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
02/20/2024 COT - RSBU - Preslab Passed
02/20/2024 COT - RSEL - Grounding/Bonding Passed
04/10/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Ok to cover exterior walls.
04/10/2024 COT - RSBU - Roof Nailing Passed Ok to dry-in roof system
05/29/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/11/2024 COT - RSBU - Interior Shear Bracing Passed
07/25/2024 COT - RSPL - Sewer Passed
08/01/2024 COT - RSPL - Yard Water Line Passed
08/01/2024 COT - RSEL - Electrical Underground Passed
10/11/2024 BULD - Electrical Clearance Passed 10/11/24: TEP ECO CLEARANCE FOR 615 W ALTURAS ST BLDG 16 UNITS 16101 and unit 16102
11/19/2024 COT - FCON - Sprinkler - Final Passed
11/21/2024 COT - RSEL - Outdoor Lighting Passed
11/21/2024 COT - RSME - Mechanical Final Passed
11/21/2024 RSBU - Building Progress Passed
11/22/2024 COT - RSEL - Electrical Final Passed
11/26/2024 COT - RSPL - Plumbing Final Passed
11/26/2024 RSBU - Building Final Passed
06/12/2025 ENGR Engineering Final Passed