| 06/12/2025 |
ENGR Engineering Final
|
|
Passed |
|
| 11/25/2024 |
ENGR Engineering Final
|
|
Not Ready |
The landscaping is not complete. The basins are not complete. The grading in the back of the units are not complete. |
| 11/27/2024 |
ENGR Engineering Final
|
|
Partial Pass |
contractor needs to finish putting in the DG , DG back in the alleyway the downspouts needs to be moved, so it does not hit the sidewalk area. And the tree staking. |
| 12/03/2024 |
ENGR Engineering Final
|
|
Partial Pass |
Contractors good for TCO level four building 16. Needs to place DG in the backyard and clean out the scupper in front. |
| 12/12/2024 |
ENGR Engineering Final
|
|
Partial Pass |
Okay for TCO level 4 |