Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0823-01422
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
615 W ALTURAS ST BLDG 3
Address NEW:
615 W ALTURAS ST BLDG 3
Apply Date:
08/18/2023
Applicant:
Description:
2231 Sleepy Hollow Estates
Permit Reviews
Permit Number - TC-MDP-0823-01422
Permit Status: Complete
Permit Description: 2231 Sleepy Hollow Estates
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/07/2023 | RESTAMP - RESIDENTIAL v.1 | 09/07/2023 | APPROVED |
| 02/21/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/25/2025 | APPROVED |
| 09/06/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.3 | 09/07/2023 | APPROVED |
| 08/31/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 08/31/2023 | REQUIRES RESUBMIT |
| 08/18/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/25/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0823-01422
Permit Status: Complete
Permit Description: 2231 Sleepy Hollow Estates
| Date | Description | Comments |
|---|---|---|
| 08/21/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 05/17/2023 | Post-Installed Anchor Inspection Report is required. | |
| 05/17/2023 | Post-Tension Inspection Report is required. | |
| 01/31/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 05/17/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 08/18/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 05/17/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0823-01422
Permite Description: 2231 Sleepy Hollow Estates
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/13/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 9/13/24: ALL LISTED ITEMS WERE FOUND ON FIRST FLOOR EAST UNIT. STOPPED INSPECTION. Anchor bolt spacing at Shearwalls not per plan, anchor bolts must be properly fastened, holdowns must be properly fastened, Anchor bolts required 12" from edge of sill plate, Web stiffeners must be properly fastened, missing web stiffeners throughout,post to beam connections not per plan, SW1 schedule fasteners not per schedule, Missing jack/king studs at openings. field modified TJI must be repaired/replaced. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. |
| 01/10/2025 | COT - RSBU - Interior Shear Bracing | N/A | Not Applicable | |
| 01/10/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 01/10/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 02/14/2025 | RSBU - Building Progress | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0823-01422
Permit Description: 2231 Sleepy Hollow Estates
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/14/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill shading required. 5/14/2024 | |
| 05/29/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 05/29/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 05/29/2024 | COT - RSBU - Preslab | Passed | ||
| 08/01/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 09/17/2024 | COT - RSPL - Sewer | Passed | ||
| 09/17/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 09/25/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 09/25/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 01/14/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | OK to insulate and Sheetrock throughout | |
| 02/14/2025 | BULD - Electrical Clearance | Passed | ||
| 02/28/2025 | COT - FCON - Sprinkler - Final | Passed | ||
| 02/28/2025 | COT - RSEL - Electrical Final | Passed | 2-28-25, electrical, mechanical, plumbing, outdoor lighting and Building finals approved for Unit's 3101 & 3102. | |
| 02/28/2025 | COT - RSEL - Outdoor Lighting | Passed | 2-28-25, electrical, mechanical, plumbing, outdoor lighting and Building finals approved for Unit's 3101 & 3102. | |
| 02/28/2025 | COT - RSME - Mechanical Final | Passed | 2-28-25, electrical, mechanical, plumbing, outdoor lighting and Building finals approved for Unit's 3101 & 3102. | |
| 02/28/2025 | COT - RSPL - Plumbing Final | Passed | 2-28-25, electrical, mechanical, plumbing, outdoor lighting and Building finals approved for Unit's 3101 & 3102. | |
| 02/28/2025 | RSBU - Building Final | Passed | 2-28-25, electrical, mechanical, plumbing, outdoor lighting and Building finals approved for Unit's 3101 & 3102. | |
| 06/12/2025 | ENGR Engineering Final | Passed |