Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0823-01379
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6543 E PASEO BARANDA
Address NEW:
6543 E PASEO BARANDA
Apply Date:
08/11/2023
Applicant:
Joshua Swinney
Description:
510 Eisenhower Model Plan
Permit Reviews
Permit Number - TC-MDP-0823-01379
Permit Status: Complete
Permit Description: 510 Eisenhower Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/07/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/07/2023 | APPROVED |
| 05/09/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/10/2024 | APPROVED |
| 08/14/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/16/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0823-01379
Permit Status: Complete
Permit Description: 510 Eisenhower Model Plan
| Date | Description | Comments |
|---|---|---|
| 05/10/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 05/10/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 12/22/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 05/09/2024 | Post-Installed Anchor Inspection Report is required. | |
| 08/15/2023 | Post-Tension Inspection Report is required. | |
| 08/07/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 08/11/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 05/10/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 08/07/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 05/09/2024 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 05/10/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
| 12/22/2022 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0823-01379
Permite Description: 510 Eisenhower Model Plan
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/15/2023 | COT - RSPL - Yard Water Line | N/A | Not Ready | 9/15/23 not pressure tested either water/air gauge |
| 10/23/2023 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 10/23/2023 | COT - BULD - SWG Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0823-01379
Permit Description: 510 Eisenhower Model Plan
Total Completed Inspections - 19