Permit: TC-MDP-0823-01376
Permit Details
Apply Date:
11/14/2023
Applicant:
Joshua Swinney
Description:
510 Eisenhower Model Plan
Permit Reviews
Permit Number - TC-MDP-0823-01376
Permit Status: Complete
Permit Description: 510 Eisenhower Model Plan
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/30/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 11/30/2023 | APPROVED |
08/22/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/23/2024 | APPROVED |
10/27/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 11/30/2023 | IN REVIEW |
02/27/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/29/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0823-01376
Permit Status: Complete
Permit Description: 510 Eisenhower Model Plan
Date | Description | Comments |
---|---|---|
11/15/2023 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
02/29/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
12/22/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
11/15/2023 | Post-Tension Inspection Report is required. | |
08/11/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
12/12/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
12/12/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
08/23/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
02/29/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
12/22/2022 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0823-01376
Permite Description: 510 Eisenhower Model Plan
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/28/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
03/14/2024 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Setbacks |
06/03/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0823-01376
Permit Description: 510 Eisenhower Model Plan
Total Completed Inspections - 19
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/14/2024 | COT - RSPL - Rough Soil | Passed | ||
03/28/2024 | COT - RSEL - Electrical Underground | Passed | ||
04/03/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is properly installed per plans, Simpson clips are properly installed and secured to form work per plans, all plumbing pipes are properly wrapped with foam padding, and 20' rebar is placed in footing for Ufer ground. Okay to pour concrete. | |
04/03/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is properly installed per plans, Simpson clips are properly installed and secured to form work per plans, all plumbing pipes are properly wrapped with foam padding, and 20' rebar is placed in footing for Ufer ground. Okay to pour concrete. | |
04/03/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is properly installed per plans, Simpson clips are properly installed and secured to form work per plans, all plumbing pipes are properly wrapped with foam padding, and 20' rebar is placed in footing for Ufer ground. Okay to pour concrete. | |
04/25/2024 | COT - RSBU - Roof Nailing | Passed | ||
06/03/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
06/03/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
06/05/2024 | COT - RSPL - Yard Water Line | Passed | 6/4/24: Main water line is connected to City water meter and under street pressure. Okay to shade and backfill trench. | |
06/17/2024 | COT - RSBU - Interior Shear Bracing | Passed | Interior shear walls are properly drywalled with the correct screw pattern per plan. Okay to proceed with tape, texture, and paint of walls and ceiling. | |
07/17/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
08/06/2024 | COT - RSPL - Sewer | Passed | ||
08/27/2024 | ENGR Engineering Final | Passed | ||
08/29/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
08/29/2024 | COT - RSME - Mechanical Final | Passed | ||
08/29/2024 | RSBU - Building Progress | Passed | ||
08/29/2024 | COT - RSPL - Plumbing Final | Passed | ||
08/30/2024 | COT - RSEL - Electrical Final | Passed | 8/30/24: 40 amp breaker installed for A/C unit, lock-out bar installed on hot water breaker, and seal tight whip on A/C has a second strap attached. | |
08/30/2024 | RSBU - Building Final | Passed | 8/30/24: 40 amp breaker installed for A/C unit, lock-out bar installed on hot water breaker, and seal tight whip on A/C has a second strap attached. Okay to issue Certificate of Occupancy. |