Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date |
Description |
Inspector |
Results |
Comments |
| 08/29/2024 |
RSBU - Building Final |
|
Re-inspection required |
Breaker over amped provide 40. Provide lock out at water heater breaker. Secure seal tight whip. 8/29/2024 |
| 08/30/2024 |
RSBU - Building Final |
|
Passed |
8/30/24: 40 amp breaker installed for A/C unit, lock-out bar installed on hot water breaker, and seal tight whip on A/C has a second strap attached. Okay to issue Certificate of Occupancy. |