Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0823-01371
Permit Details
Apply Date:
11/14/2023
Applicant:
Joshua Swinney
Description:
490 Indiana Dunes Model Plan for La Estancia Blocks 6, 7, 8
Permit Reviews
Permit Number - TC-MDP-0823-01371
Permit Status: Complete
Permit Description: 490 Indiana Dunes Model Plan for La Estancia Blocks 6, 7, 8
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/22/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/23/2024 | APPROVED |
10/26/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 11/22/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0823-01371
Permit Status: Complete
Permit Description: 490 Indiana Dunes Model Plan for La Estancia Blocks 6, 7, 8
Date | Description | Comments |
---|---|---|
11/15/2023 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
11/15/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
11/15/2023 | Post-Tension Inspection Report is required. | |
08/11/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
12/12/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
12/12/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
08/23/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
11/15/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0823-01371
Permite Description: 490 Indiana Dunes Model Plan for La Estancia Blocks 6, 7, 8
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/28/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
03/14/2024 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Setbacks |
06/03/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0823-01371
Permit Description: 490 Indiana Dunes Model Plan for La Estancia Blocks 6, 7, 8
Total Completed Inspections - 19
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/14/2024 | COT - RSPL - Rough Soil | Passed | ||
03/28/2024 | COT - RSEL - Electrical Underground | Passed | ||
04/03/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is properly installed per plans, Simpson clips are properly installed and secured to form work per plans, all plumbing pipes are properly wrapped with foam padding, and 20' rebar is placed in footing for Ufer ground. Okay to pour concrete. | |
04/03/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is properly installed per plans, Simpson clips are properly installed and secured to form work per plans, all plumbing pipes are properly wrapped with foam padding, and 20' rebar is placed in footing for Ufer ground. Okay to pour concrete. | |
04/03/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is properly installed per plans, Simpson clips are properly installed and secured to form work per plans, all plumbing pipes are properly wrapped with foam padding, and 20' rebar is placed in footing for Ufer ground. Okay to pour concrete. | |
04/23/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
04/23/2024 | COT - RSBU - Roof Nailing | Passed | ||
06/03/2024 | COT - RSPL - Yard Water Line | Passed | ||
06/05/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 6/4/24: Master shower wall has been re-built due to damage from drywall that fell over onto it. Over notched stud has been replaced on other wall in master bathroom. Okay to proceed with installation of insulation and drywall. | |
06/13/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
07/19/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
08/06/2024 | COT - RSPL - Sewer | Passed | ||
08/27/2024 | ENGR Engineering Final | Passed | ||
08/29/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
08/29/2024 | COT - RSME - Mechanical Final | Passed | ||
08/29/2024 | RSBU - Building Progress | Passed | ||
08/30/2024 | COT - RSEL - Electrical Final | Passed | 8/30/24: 40 amp breaker installed for A/C unit, lock-out bar installed on hot water breaker, and seal tight whip on A/C has a second strap attached. Leak at dishwasher has been corrected. Broken roof tiles have been replaced. Okay to issue Certificate of Occupancy. | |
08/30/2024 | COT - RSPL - Plumbing Final | Passed | 8/30/24: 40 amp breaker installed for A/C unit, lock-out bar installed on hot water breaker, and seal tight whip on A/C has a second strap attached. Leak at dishwasher has been corrected. Broken roof tiles have been replaced. Okay to issue Certificate of Occupancy. | |
08/30/2024 | RSBU - Building Final | Passed | 8/30/24: 40 amp breaker installed for A/C unit, lock-out bar installed on hot water breaker, and seal tight whip on A/C has a second strap attached. Leak at dishwasher has been corrected. Broken roof tiles have been replaced. Okay to issue Certificate of Occupancy. |