Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0823-01362
Permit Details
Apply Date:
08/15/2023
Applicant:
Andrea Flood
Description:
SFR F40J22 T22-M0022 revision truss calcs (optional GR RM added)
Permit Reviews
Permit Number - TC-MDP-0823-01362
Permit Status: Needs resubmittal
Permit Description: SFR F40J22 T22-M0022 revision truss calcs (optional GR RM added)
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/04/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/08/2024 | APPROVED |
08/16/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/21/2023 | APPROVED |
04/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/15/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-0823-01362
Permit Status: Needs resubmittal
Permit Description: SFR F40J22 T22-M0022 revision truss calcs (optional GR RM added)
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
01/18/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
04/03/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
04/03/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
04/03/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
07/20/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0823-01362
Permit Status: Needs resubmittal
Permit Description: SFR F40J22 T22-M0022 revision truss calcs (optional GR RM added)
Date | Description | Comments |
---|---|---|
07/20/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/09/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
01/18/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
04/03/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Needs Resubmittal
Permit Number: TC-MDP-0823-01362
Permit Description: SFR F40J22 T22-M0022 revision truss calcs (optional GR RM added)
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/27/2023 | COT - RSPL - Rough Soil | Passed | ||
09/27/2023 | COT - RSPL - Sewer | Passed | ||
10/13/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
10/13/2023 | COT - RSBU - Preslab | Passed | ||
10/13/2023 | COT - RSEL - Electrical Underground | Passed | ||
10/13/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
11/06/2023 | COT - RSBU - Roof Nailing | Passed | ||
12/19/2023 | COT - RSPL - Yard Water Line | Passed | ||
12/20/2023 | BULD - Electrical Clearance | Passed | TEP eco | |
12/20/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
12/20/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
12/20/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
02/07/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
03/21/2024 | COT - BULD - SWG Clearance | Passed | ||
04/03/2024 | COT - RSEL - Electrical Final | Passed | Construction, mechanical, plumbing, and electrical work is complete. All fixtures are properly installed and operational. AFCI Breakers are installed in panel for all required circuits, GFCI Breakers are installed in panel for kitchen, bathroom, exterior, and garage outlets. A light fixture and receptacle are located in attic for servicing the a/c equipment. Water heater is installed and properly plumbed to the exterior. Okay to issue Certificate of Occupancy after all other inspections are completed and passed. | |
04/03/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is properly installed and per plans. | |
04/03/2024 | COT - RSME - Mechanical Final | Passed | Construction, mechanical, plumbing, and electrical work is complete. All fixtures are properly installed and operational. AFCI Breakers are installed in panel for all required circuits, GFCI Breakers are installed in panel for kitchen, bathroom, exterior, and garage outlets. A light fixture and receptacle are located in attic for servicing the a/c equipment. Water heater is installed and properly plumbed to the exterior. Okay to issue Certificate of Occupancy after all other inspections are completed and passed. | |
04/03/2024 | COT - RSPL - Plumbing Final | Passed | Construction, mechanical, plumbing, and electrical work is complete. All fixtures are properly installed and operational. AFCI Breakers are installed in panel for all required circuits, GFCI Breakers are installed in panel for kitchen, bathroom, exterior, and garage outlets. A light fixture and receptacle are located in attic for servicing the a/c equipment. Water heater is installed and properly plumbed to the exterior. Okay to issue Certificate of Occupancy after all other inspections are completed and passed. | |
04/03/2024 | RSBU - Building Final | Passed | Construction, mechanical, plumbing, and electrical work is complete. All fixtures are properly installed and operational. AFCI Breakers are installed in panel for all required circuits, GFCI Breakers are installed in panel for kitchen, bathroom, exterior, and garage outlets. A light fixture and receptacle are located in attic for servicing the a/c equipment. Water heater is installed and properly plumbed to the exterior. Okay to issue Certificate of Occupancy after all other inspections are completed and passed. | |
04/03/2024 | RSBU - Building Progress | Passed | Construction, mechanical, plumbing, and electrical work is complete. All fixtures are properly installed and operational. AFCI Breakers are installed in panel for all required circuits, GFCI Breakers are installed in panel for kitchen, bathroom, exterior, and garage outlets. A light fixture and receptacle are located in attic for servicing the a/c equipment. Water heater is installed and properly plumbed to the exterior. Okay to issue Certificate of Occupancy after all other inspections are completed and passed. | |
04/03/2024 | ENGR Engineering Final | Passed |