Permit: TC-MDP-0823-01357
Permit Details
Apply Date:
09/19/2023
Applicant:
Description:
VC 1262-130
Permit Reviews
Permit Number - TC-MDP-0823-01357
Permit Status: Inspections complete
Permit Description: VC 1262-130
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/20/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/21/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0823-01357
Permit Status: Inspections complete
Permit Description: VC 1262-130
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
04/03/2023 | Post-Tension Inspection Report is required. |
04/03/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
08/11/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
09/20/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
09/20/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
09/20/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0823-01357
Permit Status: Inspections complete
Permit Description: VC 1262-130
Date | Description | Comments |
---|---|---|
09/21/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
08/11/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01357
Permite Description: VC 1262-130
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/24/2023 | COT - RSEL - Electrical Underground | N/A | Not Applicable | |
11/02/2023 | COT - RSBU - Exterior Clips/Sheathing | N/A | Re-inspection required | Headers not per plan, fix headers for entrance of garage, front and back porch headers, apply headers per plan., missing anchor bolts at shear walls. Anchor bolts at Shear walls SW11 and greater must be installed with 3x3” plate washers or greater per plans, add shot pins to some plates at master bathroom, add shot pins throughout, foundation for back porch pillar cracked, anchor bolts missing throughout, add straps to connect trimmer and header throughout. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01357
Permit Description: VC 1262-130
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/18/2023 | COT - RSPL - Rough Soil | Passed | ||
10/24/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
10/24/2023 | COT - RSBU - Preslab | Passed | ||
10/24/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
10/31/2023 | COT - RSPL - Sewer | Passed | ||
10/31/2023 | COT - RSPL - Yard Water Line | Passed | ||
11/02/2023 | COT - RSBU - Roof Nailing | Passed | ||
11/08/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | 11/8/23: Contractor Superintendent Karl Chlarson has a letter from the engineer approving the larger size headers at garage entrance and front/rear porch entrance. Anchor bolts with 3x3 plate washers have been installed in shear wall SW11, shot pins have been installed at all locations marked with an X on sole plate. Straps have been installed to the headers and trimmer locations. Okay to proceed with roof and exterior wall dry-in. | |
11/22/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
11/27/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Corrections were made. 11/27/2023 | |
11/28/2023 | BULD - Electrical Clearance | Passed | ||
12/05/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
01/12/2024 | COT - BULD - SWG Clearance | Passed | ||
02/16/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
02/16/2024 | COT - RSPL - Plumbing Final | Passed | ||
02/16/2024 | RSBU - Building Progress | Passed | ||
02/21/2024 | COT - RSEL - Electrical Final | Passed | ||
02/21/2024 | COT - RSME - Mechanical Final | Passed | ||
02/21/2024 | RSBU - Building Final | Passed | ||
02/21/2024 | ENGR Engineering Final | Passed |