Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
09/12/2023
Applicant:
Description:
VC 1262-130

Permit Reviews

Permit Number - TC-MDP-0823-01355
Permit Status: Inspections complete
Permit Description: VC 1262-130
Start Date Submittal Complete Date Status  
09/13/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/18/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0823-01355
Permit Status: Inspections complete
Permit Description: VC 1262-130
Total Outstanding Activity Conditions - 7
Date Name
04/03/2023 Post-Tension Inspection Report is required.
04/03/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
08/11/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
09/13/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/13/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/13/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
09/14/2023 A building permit is required for the retaining wall prior to finalization

Conditions

Permit Number - TC-MDP-0823-01355
Permit Status: Inspections complete
Permit Description: VC 1262-130
Date Description Comments
09/18/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
08/09/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/11/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01355
Permit Description: VC 1262-130
Total Completed Inspections - 21
Date Description Inspector Results Comments
10/03/2023 COT - RSPL - Rough Soil Passed
10/03/2023 COT - RSPL - Sewer Passed
10/03/2023 COT - RSPL - Yard Water Line Passed
10/06/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
10/06/2023 COT - RSBU - Preslab Passed
10/06/2023 COT - RSEL - Electrical Underground Passed
10/06/2023 COT - RSEL - Grounding/Bonding Passed
10/18/2023 COT - RSBU - Roof Nailing Passed
11/06/2023 COT - RSBU - Exterior Clips/Sheathing Passed
11/06/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/06/2023 COT - RSPL - Gas Pressure Test Passed
11/08/2023 BULD - Electrical Clearance Passed 11/8/23: Electrical panel is properly labeled, ground is attached to Ufer ground and address label is attached to meter box below meter socket. Level ECO clearance issued for building. Okay to energize electrical panel.
11/14/23 Clearance resent to TEP by email
11/14/2023 COT - RSBU - Interior Shear Bracing Passed
01/09/2024 COT - BULD - SWG Clearance Passed
01/23/2024 COT - RSEL - Outdoor Lighting Passed
01/23/2024 COT - RSPL - Plumbing Final Passed
01/23/2024 RSBU - Building Progress Passed
01/23/2024 ENGR Engineering Final Passed In the future make sure all exterior ABS plumbing is cut down to grade so only the caps are showing.
01/26/2024 COT - RSEL - Electrical Final Passed
01/26/2024 COT - RSME - Mechanical Final Passed
01/26/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
RVC 33 SIC-2023-09-12_V1.PDF DOCUMENTS VIEW
VALENCIA CROSSING - LOT 33 START_V1.PDF DOCUMENTS VIEW