Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/23/2024 | ENGR Engineering Final | Passed | In the future make sure all exterior ABS plumbing is cut down to grade so only the caps are showing. |