Permit: TC-MDP-0823-01353
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12801 E TORTOISE CANYON LN
Address NEW:
12801 E TORTOISE CANYON LN
Apply Date:
09/25/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKF55I T21-M0086
Permit Reviews
Permit Number - TC-MDP-0823-01353
Permit Status: Inspections complete
Permit Description: SFR RKF55I T21-M0086
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/25/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/28/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0823-01353
Permit Status: Inspections complete
Permit Description: SFR RKF55I T21-M0086
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 09/25/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 09/25/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 09/25/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 09/25/2023 | Post-Tension Inspection Report is required. |
| 09/25/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 09/25/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0823-01353
Permit Status: Inspections complete
Permit Description: SFR RKF55I T21-M0086
| Date | Description | Comments |
|---|---|---|
| 05/18/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01353
Permite Description: SFR RKF55I T21-M0086
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/26/2024 | ENGR Engineering Final | N/A | Not Ready | 1) COMPLETE PLACEMENT OF BACKFILL MATERIAL ALONG THE EXTERIOR OF ALL WALLS FOR THIS SITE. 2) REMOVE ALL CONSTRUCTION TRASH AN DEBRIS FROM THE COMMON AREAS ADJACENT TO THIS SITE. THIS WILL INCLUDE BUT NOT LIMITED TO CONCRETE, BAGS OF SAND, TARPS, AND ANY OTHER TYPE OF CONSTRUCTION MATERIAL NOTED WITHIN THE COMMON AREAS. 3) THE REAR LOT DRAINAGE OPENINGS HAVE NOT BEEN PROVIDED AS SHOWN ON THE APPROVED PLAN FOR THIS LOT. 4) ENSURE THE LOT DRAINAGE IS AS SHOWN ON THE APPROVED PLANS FOR THIS SITE FOR THE FRONT AND REAR OF THIS LOT. ONCE THIS WORK HAS BEEN COMPLETED A RE-INSPECTION OF THIS SITE WILL BE REQUESTED AND APPROVED BEFORE A CERTIFICATE OF OCCUPANCY CAN BE ISSUED. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01353
Permit Description: SFR RKF55I T21-M0086
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/08/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 11/08/2023 | COT - RSPL - Sewer | Passed | ||
| 11/08/2023 | COT - RSPL - Rough Soil | Passed | ||
| 11/08/2023 | COT - RSPL - Backwater Valve | Passed | ||
| 11/16/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 11/16/2023 | COT - RSBU - Preslab | Passed | ||
| 11/16/2023 | COT - RSEL - Electrical Underground | Passed | ||
| 11/16/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 12/15/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 12/15/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 12/15/23: missing anchor bolts at owner suite shear wall ok to continue to intermediates will check for anchor bolts then | |
| 01/25/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 01/25/2024 | RSBU - Building Progress | Passed | ||
| 01/25/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 01/25/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 02/16/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 04/10/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
| 04/26/2024 | RSBU - Building Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI outlets are installed in bathrooms, garage, outside receptacles, laundry room, and kitchen. AFCI breakers are installed for bedrooms, living room, den, and dining room. Return and supply registers are installed. Okay to issue Certificate of Occupancy for this project and permit. | |
| 04/26/2024 | COT - RSPL - Plumbing Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI outlets are installed in bathrooms, garage, outside receptacles, laundry room, and kitchen. AFCI breakers are installed for bedrooms, living room, den, and dining room. Return and supply registers are installed. Okay to issue Certificate of Occupancy for this project and permit. | |
| 04/26/2024 | COT - RSME - Mechanical Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI outlets are installed in bathrooms, garage, outside receptacles, laundry room, and kitchen. AFCI breakers are installed for bedrooms, living room, den, and dining room. Return and supply registers are installed. Okay to issue Certificate of Occupancy for this project and permit. | |
| 04/26/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is installed per plans and fully operational. | |
| 04/26/2024 | COT - RSEL - Electrical Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI outlets are installed in bathrooms, garage, outside receptacles, laundry room, and kitchen. AFCI breakers are installed for bedrooms, living room, den, and dining room. Return and supply registers are installed. Okay to issue Certificate of Occupancy for this project and permit. | |
| 05/06/2024 | ENGR Engineering Final | Passed |