Permit: TC-MDP-0823-01351
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12794 E TORTOISE CANYON LN
Address NEW:
12794 E TORTOISE CANYON LN
Apply Date:
08/08/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKF55I T21-M0086
Permit Reviews
Permit Number - TC-MDP-0823-01351
Permit Status: Inspections complete
Permit Description: SFR RKF55I T21-M0086
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/08/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/09/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0823-01351
Permit Status: Inspections complete
Permit Description: SFR RKF55I T21-M0086
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 08/08/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 08/08/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 08/08/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 08/08/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 08/09/2023 | A building permit for the retaining wall is required prior to finalization. |
| 08/09/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01351
Permit Description: SFR RKF55I T21-M0086
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/26/2023 | COT - RSPL - Rough Soil | Passed | ||
| 09/26/2023 | COT - RSPL - Sewer | Passed | ||
| 09/26/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 10/05/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 10/05/2023 | COT - RSBU - Preslab | Passed | ||
| 10/05/2023 | COT - RSEL - Electrical Underground | Passed | ||
| 10/05/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/24/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 10/24/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 01/09/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 01/09/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 01/11/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 01/25/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 04/05/2024 | COT - BULD - SWG Clearance | Passed | All gas appliance locations have shut off valves and gas flex lines attached to gas piping. Okay to proceed with installation of gas meter. | |
| 04/09/2024 | RSBU - Building Progress | Passed | ||
| 04/15/2024 | COT - RSEL - Electrical Final | Passed | Electrical panel is properly labeled, all receptacles and cover plates are installed, all lighting fixtures, exhaust fans, switches and cover plates are properly installed. | |
| 04/15/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is installed per plans. | |
| 04/15/2024 | COT - RSME - Mechanical Final | Passed | A/C unit is installed with correct breaker, supply and return air registers are installed, thermostat is installed, and new air filters are installed. Mechanical is complete. | |
| 04/15/2024 | COT - RSPL - Plumbing Final | Passed | Plumbing fixtures are installed and operational. Hot water heater is installed and working. Toilets are installed and caulked to floor. | |
| 04/15/2024 | RSBU - Building Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. All fixtures, outlets, switches, and valves are fully operational. Okay to issue Certificate of Occupancy for this project. | |
| 04/15/2024 | ENGR Engineering Final | Passed |