Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
08/08/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKF55I T21-M0086

Permit Reviews

Permit Number - TC-MDP-0823-01351
Permit Status: Inspections complete
Permit Description: SFR RKF55I T21-M0086
Start Date Submittal Complete Date Status  
08/08/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/09/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0823-01351
Permit Status: Inspections complete
Permit Description: SFR RKF55I T21-M0086
Total Outstanding Activity Conditions - 6
Date Name
08/08/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/08/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/08/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/08/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
08/09/2023 A building permit for the retaining wall is required prior to finalization.
08/09/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01351
Permit Description: SFR RKF55I T21-M0086
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/26/2023 COT - RSPL - Rough Soil Passed
09/26/2023 COT - RSPL - Sewer Passed
09/26/2023 COT - RSPL - Yard Water Line Passed
10/05/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
10/05/2023 COT - RSBU - Preslab Passed
10/05/2023 COT - RSEL - Electrical Underground Passed
10/05/2023 COT - RSEL - Grounding/Bonding Passed
10/24/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
10/24/2023 COT - RSBU - Roof Nailing Passed
01/09/2024 BULD - Electrical Clearance Passed TEP ECO
01/09/2024 COT - RSPL - Gas Pressure Test Passed
01/11/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
01/25/2024 COT - RSBU - Interior Shear Bracing Passed
04/05/2024 COT - BULD - SWG Clearance Passed All gas appliance locations have shut off valves and gas flex lines attached to gas piping. Okay to proceed with installation of gas meter.
04/09/2024 RSBU - Building Progress Passed
04/15/2024 COT - RSEL - Electrical Final Passed Electrical panel is properly labeled, all receptacles and cover plates are installed, all lighting fixtures, exhaust fans, switches and cover plates are properly installed.
04/15/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is installed per plans.
04/15/2024 COT - RSME - Mechanical Final Passed A/C unit is installed with correct breaker, supply and return air registers are installed, thermostat is installed, and new air filters are installed. Mechanical is complete.
04/15/2024 COT - RSPL - Plumbing Final Passed Plumbing fixtures are installed and operational. Hot water heater is installed and working. Toilets are installed and caulked to floor.
04/15/2024 RSBU - Building Final Passed Construction, mechanical, electrical, and plumbing work is complete. All fixtures, outlets, switches, and valves are fully operational. Okay to issue Certificate of Occupancy for this project.
04/15/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-08-08_V1.PDF DOCUMENTS VIEW