Inspection History Details
Inspection Status: Passed
Inspection History: COT - RSPL - Plumbing FinalĀ
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/15/2024 | COT - RSPL - Plumbing FinalĀ | Passed | Plumbing fixtures are installed and operational. Hot water heater is installed and working. Toilets are installed and caulked to floor. |