Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
08/09/2023
Applicant:
Description:
VC 1383-130

Permit Reviews

Permit Number - TC-MDP-0823-01345
Permit Status: Complete
Permit Description: VC 1383-130
Start Date Submittal Complete Date Status  
08/09/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/11/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0823-01345
Permit Status: Complete
Permit Description: VC 1383-130
Total Outstanding Activity Conditions - 6
Date Name
04/03/2023 Post-Tension Inspection Report is required.
04/03/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
08/09/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/09/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
08/11/2023 Post-Tension Inspection Report is required.
08/11/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0823-01345
Permit Status: Complete
Permit Description: VC 1383-130
Date Description Comments
08/08/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/11/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0823-01345
Permite Description: VC 1383-130
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
10/23/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required Add nail plate for electrical conduit at top plate to right side of garage, add more nails to nail plate for gas line in garage, tub/shower not under test, dwv not under test, support copper pipe in master bedroom, provide plans.
10/23/2023 BULD - Electrical Clearance N/A Re-inspection required Add nail plate for electrical conduit at top plate to right side of garage, add more nails to nail plate for gas line in garage, tub/shower not under test, dwv not under test, support copper pipe in master bedroom, provide plans.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0823-01345
Permit Description: VC 1383-130
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/13/2023 COT - RSPL - Rough Soil Passed
09/13/2023 COT - RSPL - Sewer Passed
09/13/2023 COT - RSPL - Yard Water Line Passed
09/21/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
09/21/2023 COT - RSBU - Preslab Passed
09/21/2023 COT - RSEL - Electrical Underground Passed
09/21/2023 COT - RSEL - Grounding/Bonding Passed
10/09/2023 COT - RSBU - Exterior Clips/Sheathing Passed 1/9/23 missing anchor bolts and one shot nail interior will pass and check at intermediate
10/09/2023 COT - RSBU - Roof Nailing Passed 1/9/23 missing anchor bolts and one shot nail interior will pass and check at intermediate
10/23/2023 COT - RSPL - Gas Pressure Test Passed
10/25/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 10/25/23: Nail plates have been added to gas line in garage and solar conduit in garage. Tub/shower and DWV are under water test. Blocking has been added to support hose bib in master bedroom. Okay to proceed with drywall application.
10/25/2023 BULD - Electrical Clearance Passed 10/25/23: Nail plates have been added to gas line in garage and solar conduit in garage. Tub/shower and DWV are under water test. Blocking has been added to support hose bib in master bedroom. Okay to proceed with drywall application.
11/14/23 Clearance resent to TEP by email
11/02/2023 COT - RSBU - Interior Shear Bracing Passed
12/13/2023 COT - BULD - SWG Clearance Passed
01/09/2024 COT - RSEL - Electrical Final Passed
01/09/2024 COT - RSEL - Outdoor Lighting Passed
01/09/2024 COT - RSME - Mechanical Final Passed
01/09/2024 COT - RSPL - Plumbing Final Passed
01/09/2024 RSBU - Building Final Passed
01/09/2024 RSBU - Building Progress Passed
01/09/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
VALENCIA CROSSING - LOT 30 START_V1.PDF DOCUMENTS VIEW
VC 30 SIC-2023-08-09_V1.PDF DOCUMENTS VIEW