Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/23/2023 | BULD - Electrical Clearance | Re-inspection required | Add nail plate for electrical conduit at top plate to right side of garage, add more nails to nail plate for gas line in garage, tub/shower not under test, dwv not under test, support copper pipe in master bedroom, provide plans. | |
| 10/25/2023 | BULD - Electrical Clearance | Passed | 10/25/23: Nail plates have been added to gas line in garage and solar conduit in garage. Tub/shower and DWV are under water test. Blocking has been added to support hose bib in master bedroom. Okay to proceed with drywall application. 11/14/23 Clearance resent to TEP by email |