Permit: TC-MDP-0823-01344
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12817 E TORTOISE CANYON LN
Address NEW:
12817 E TORTOISE CANYON LN
Apply Date:
05/28/2024
Applicant:
Description:
SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Permit Reviews
Permit Number - TC-MDP-0823-01344
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/30/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/04/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0823-01344
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 06/04/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 06/04/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 06/04/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 06/04/2024 | Post-Tension Inspection Report is required. |
| 06/04/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0823-01344
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
| Date | Description | Comments |
|---|---|---|
| 08/08/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 06/04/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01344
Permite Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2024 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Re-inspection required | 7/15/24: rebar not to schedule at front perimeter of bedroom 4 |
| 07/15/2024 | COT - RSBU - Preslab | N/A | Re-inspection required | 7/15/24: rebar not to schedule at front perimeter of bedroom 4 |
| 09/18/2024 | RSBU - Building Progress | N/A | Canceled |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01344
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/03/2024 | COT - RSPL - Backwater Valve | Passed | Underground plumbing is connected to main sewer line with backwater valve installed between clean outs. Complete system is under water test with no leaks. | |
| 07/03/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing is connected to main sewer line with backwater valve installed between clean outs. Complete system is under water test with no leaks. | |
| 07/03/2024 | COT - RSPL - Sewer | Passed | Underground plumbing is connected to main sewer line with backwater valve installed between clean outs. Complete system is under water test with no leaks. | |
| 07/03/2024 | COT - RSPL - Yard Water Line | Passed | Main water supply line is connected to City Water with a meter and is under street pressure with no leaks. Okay to shade pipe and backfill trench. | |
| 07/15/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 07/15/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 07/16/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 07/16/2024 | COT - RSBU - Preslab | Passed | ||
| 08/20/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 8/20/2024 corrections were made. | |
| 08/20/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 10/03/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 10/07/2024 | BULD - Electrical Clearance | Passed | 10/7/24: All 25 circuits are roughed in to electrical panel. ECO Clearance issued | |
| 10/07/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10/7/24: All items from previous inspection have been corrected. Okay to proceed with installation of insulation and drywall. | |
| 10/25/2024 | COT - RSBU - Interior Shear Bracing | Passed | 10-25-24, interior shear bracing inspection approved. Okay to tape and texture. | |
| 12/18/2024 | COT - BULD - SWG Clearance | Passed | 12/18/24 CLEARANCE for SWG approved. | |
| 01/09/2025 | COT - RSEL - Electrical Final | Passed | Passed final 1/9/25 clearance ECO | |
| 01/09/2025 | COT - RSME - Mechanical Final | Passed | Passed final 1/9/25 | |
| 01/10/2025 | RSBU - Building Final | Passed | Passed final 1/10/25 | |
| 01/09/2025 | RSBU - Building Progress | Passed | Passed final 1/9/25 | |
| 01/09/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 1/9/25 | |
| 01/10/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 1/10/25 | |
| 02/13/2025 | ENGR Engineering Final | Passed | CO Ready |