Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Canceled

Inspection History: BULD - Electrical Clearance

Date Description Inspector Results Comments
09/18/2024 BULD - Electrical Clearance Canceled
09/25/2024 BULD - Electrical Clearance Re-inspection required 9/25/24: multiple circuits tied in together throughout house, all top plate penetrations must be properly sealed, Conduits at kitchen island must be properly sealed, properly support flex duct at kitchen, properly secure NM cable at bedroom 12" from box, properly secure Condesate drain in attic at master bathroom,
10/03/2024 BULD - Electrical Clearance Re-inspection required Still missing circuits at main panel.
10/07/2024 BULD - Electrical Clearance Passed 10/7/24: All 25 circuits are roughed in to electrical panel. ECO Clearance issued