Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
08/31/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes

Permit Reviews

Permit Number - TC-MDP-0823-01342
Permit Status: Complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Start Date Submittal Complete Date Status  
09/01/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/05/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0823-01342
Permit Status: Complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Activity Conditions - 6
Date Name
09/01/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/01/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/01/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/01/2023 Post-Tension Inspection Report is required.
09/01/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
09/01/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0823-01342
Permit Status: Complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Date Description Comments
08/08/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0823-01342
Permite Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/03/2023 COT - RSEL - Grounding/Bonding N/A Re-inspection required 11/2/23: people are working on the pre-slab. Contractor is required to walk their site before calling for an inspection. This is called QC.

11/3/23: install all MASA and missing 4 hold-downs at back of house.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0823-01342
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Completed Inspections - 22
Date Description Inspector Results Comments
10/26/2023 COT - RSPL - Backwater Valve Passed
10/26/2023 COT - RSPL - Rough Soil Passed
10/26/2023 COT - RSPL - Sewer Passed
10/26/2023 COT - RSPL - Yard Water Line Passed
11/03/2023 COT - RSEL - Electrical Underground Passed
11/06/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
11/06/2023 COT - RSBU - Preslab Passed
11/06/2023 COT - RSEL - Grounding/Bonding Passed
12/18/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
12/18/2023 COT - RSBU - Roof Nailing Passed
01/18/2024 BULD - Electrical Clearance Passed TEP eco
01/18/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
01/18/2024 COT - RSPL - Gas Pressure Test Passed
02/08/2024 COT - RSBU - Interior Shear Bracing Passed
04/16/2024 COT - BULD - SWG Clearance Passed SWG for meter only
04/24/2024 COT - RSME - Mechanical Final Passed 4/24/24: Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI Receptacles are installed in bathrooms and kitchen, GFCI breaker is installed in panel for garage. Light and receptacle is installed in attic for mechanical equipment. AFCI Breakers are installed in panel for bedrooms and other outlets. Okay to issue Certificate of Occupancy for this project and permit.
04/24/2024 RSBU - Building Final Passed 4/24/24: Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI Receptacles are installed in bathrooms and kitchen, GFCI breaker is installed in panel for garage. Light and receptacle is installed in attic for mechanical equipment. AFCI Breakers are installed in panel for bedrooms and other outlets. Okay to issue Certificate of Occupancy for this project and permit.
04/24/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is properly installed per plans and fully functional.
04/24/2024 COT - RSPL - Plumbing Final Passed 4/24/24: Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI Receptacles are installed in bathrooms and kitchen, GFCI breaker is installed in panel for garage. Light and receptacle is installed in attic for mechanical equipment. AFCI Breakers are installed in panel for bedrooms and other outlets. Okay to issue Certificate of Occupancy for this project and permit.
04/24/2024 RSBU - Building Progress Passed 4/24/24: Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI Receptacles are installed in bathrooms and kitchen, GFCI breaker is installed in panel for garage. Light and receptacle is installed in attic for mechanical equipment. AFCI Breakers are installed in panel for bedrooms and other outlets. Okay to issue Certificate of Occupancy for this project and permit.
04/24/2024 COT - RSEL - Electrical Final Passed 4/24/24: Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI Receptacles are installed in bathrooms and kitchen, GFCI breaker is installed in panel for garage. Light and receptacle is installed in attic for mechanical equipment. AFCI Breakers are installed in panel for bedrooms and other outlets. Okay to issue Certificate of Occupancy for this project and permit.
04/29/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-08-31_V1.PDF DOCUMENTS VIEW