Permit: TC-MDP-0823-01342
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
12809 E TORTOISE CANYON LN
Address NEW:
12809 E TORTOISE CANYON LN
Apply Date:
08/31/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Permit Reviews
Permit Number - TC-MDP-0823-01342
Permit Status: Complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/01/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/05/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0823-01342
Permit Status: Complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 09/01/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 09/01/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 09/01/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 09/01/2023 | Post-Tension Inspection Report is required. |
| 09/01/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 09/01/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0823-01342
Permit Status: Complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
| Date | Description | Comments |
|---|---|---|
| 08/08/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0823-01342
Permite Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/03/2023 | COT - RSEL - Grounding/Bonding | N/A | Re-inspection required | 11/2/23: people are working on the pre-slab. Contractor is required to walk their site before calling for an inspection. This is called QC. 11/3/23: install all MASA and missing 4 hold-downs at back of house. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0823-01342
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2023 | COT - RSPL - Backwater Valve | Passed | ||
| 10/26/2023 | COT - RSPL - Rough Soil | Passed | ||
| 10/26/2023 | COT - RSPL - Sewer | Passed | ||
| 10/26/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 11/03/2023 | COT - RSEL - Electrical Underground | Passed | ||
| 11/06/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 11/06/2023 | COT - RSBU - Preslab | Passed | ||
| 11/06/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 12/18/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 12/18/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 01/18/2024 | BULD - Electrical Clearance | Passed | TEP eco | |
| 01/18/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 01/18/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 02/08/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 04/16/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
| 04/24/2024 | COT - RSME - Mechanical Final | Passed | 4/24/24: Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI Receptacles are installed in bathrooms and kitchen, GFCI breaker is installed in panel for garage. Light and receptacle is installed in attic for mechanical equipment. AFCI Breakers are installed in panel for bedrooms and other outlets. Okay to issue Certificate of Occupancy for this project and permit. | |
| 04/24/2024 | RSBU - Building Final | Passed | 4/24/24: Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI Receptacles are installed in bathrooms and kitchen, GFCI breaker is installed in panel for garage. Light and receptacle is installed in attic for mechanical equipment. AFCI Breakers are installed in panel for bedrooms and other outlets. Okay to issue Certificate of Occupancy for this project and permit. | |
| 04/24/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is properly installed per plans and fully functional. | |
| 04/24/2024 | COT - RSPL - Plumbing Final | Passed | 4/24/24: Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI Receptacles are installed in bathrooms and kitchen, GFCI breaker is installed in panel for garage. Light and receptacle is installed in attic for mechanical equipment. AFCI Breakers are installed in panel for bedrooms and other outlets. Okay to issue Certificate of Occupancy for this project and permit. | |
| 04/24/2024 | RSBU - Building Progress | Passed | 4/24/24: Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI Receptacles are installed in bathrooms and kitchen, GFCI breaker is installed in panel for garage. Light and receptacle is installed in attic for mechanical equipment. AFCI Breakers are installed in panel for bedrooms and other outlets. Okay to issue Certificate of Occupancy for this project and permit. | |
| 04/24/2024 | COT - RSEL - Electrical Final | Passed | 4/24/24: Construction, mechanical, electrical, and plumbing are complete. Mechanical, electrical, and plumbing fixtures are installed and operational. GFCI Receptacles are installed in bathrooms and kitchen, GFCI breaker is installed in panel for garage. Light and receptacle is installed in attic for mechanical equipment. AFCI Breakers are installed in panel for bedrooms and other outlets. Okay to issue Certificate of Occupancy for this project and permit. | |
| 04/29/2024 | ENGR Engineering Final | Passed |