Inspection Status: Not Ready

Inspection History: COT - RSEL - Grounding/Bonding 

Date Description Inspector Results Comments
11/02/2023 COT - RSEL - Grounding/Bonding  Not Ready 11/2/23: people are working on the pre-slab. Contractor is required to walk their site before calling for an inspection. This is called QC.
11/03/2023 COT - RSEL - Grounding/Bonding  Re-inspection required 11/2/23: people are working on the pre-slab. Contractor is required to walk their site before calling for an inspection. This is called QC.

11/3/23: install all MASA and missing 4 hold-downs at back of house.
11/06/2023 COT - RSEL - Grounding/Bonding  Passed