Permit: TC-MDP-0823-01341
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12782 E TORTOISE CANYON LN
Address NEW:
12782 E TORTOISE CANYON LN
Apply Date:
08/08/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Permit Reviews
Permit Number - TC-MDP-0823-01341
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/08/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/09/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0823-01341
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 08/08/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 08/08/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 08/08/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 08/08/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 08/09/2023 | A building permit for the retaining wall is required prior to finalization |
| 08/09/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0823-01341
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
| Date | Description | Comments |
|---|---|---|
| 08/08/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01341
Permite Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | Missing nail plate at garage, pex lines must be 18” away from next soldered joint at soft water and water heater appliances per M2105.10.2, missing cleanouts at water closets per P1 plans, h2.5 clips must be nailed, large duct at living room area not strapped, stopped inspection. More items may be added. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01341
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/19/2024 | COT - RSPL - Rough Soil | Passed | ||
| 01/19/2024 | COT - RSPL - Sewer | Passed | ||
| 01/19/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 01/19/2024 | COT - RSPL - Backwater Valve | Passed | ||
| 02/08/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 02/08/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 02/14/2024 | COT - RSBU - Preslab | Passed | ||
| 02/14/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 03/11/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 3-11-24: Contractor has dry packed under soil plate and added extra bolts to plate. Okay to proceed with dry-in of exterior walls and roof. | |
| 03/11/2024 | COT - RSBU - Roof Nailing | Passed | 3-11-24: Contractor has dry packed under soil plate and added extra bolts to plate. Okay to proceed with dry-in of exterior walls and roof. | |
| 04/15/2024 | BULD - Electrical Clearance | Passed | TEP ECO Clearance issued. | |
| 04/17/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 4-17-24: plumber has lengthened the copper pipe connection to the pex line per the code of 18". Okay to proceed with installation of insulation and drywall for ceilings and walls. | |
| 04/24/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is under 15# of compressed air with no leaks. Okay to proceed. | |
| 04/29/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall on interior shear walls is properly installed and secured to the studs per the plan requirements of 4" on edge and 7" in the field. Okay to proceed with tape, texture, and painting. | |
| 06/28/2024 | COT - BULD - SWG Clearance | Passed | Gas valves are properly installed in kitchen for stove, laundry room for clothes dryer, in attic for furnace, and garage for water heater. | |
| 06/28/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is installed and operational per plan requirements. | |
| 07/08/2024 | COT - RSPL - Plumbing Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and fully operational. Electrical panel is properly labeled and has GFCI & AFCI Breakers in place. Okay to issue Certificate of Occupancy once all other inspections are complete. | |
| 07/08/2024 | RSBU - Building Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and fully operational. Electrical panel is properly labeled and has GFCI & AFCI Breakers in place. Okay to issue Certificate of Occupancy once all other inspections are complete. | |
| 07/08/2024 | COT - RSME - Mechanical Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and fully operational. Electrical panel is properly labeled and has GFCI & AFCI Breakers in place. Okay to issue Certificate of Occupancy once all other inspections are complete. | |
| 07/08/2024 | ENGR Engineering Final | Passed | ||
| 07/08/2024 | RSBU - Building Progress | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and fully operational. Electrical panel is properly labeled and has GFCI & AFCI Breakers in place. Okay to issue Certificate of Occupancy once all other inspections are complete. | |
| 07/08/2024 | COT - RSEL - Electrical Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and fully operational. Electrical panel is properly labeled and has GFCI & AFCI Breakers in place. Okay to issue Certificate of Occupancy once all other inspections are complete. |