Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
08/08/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes

Permit Reviews

Permit Number - TC-MDP-0823-01341
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Start Date Submittal Complete Date Status  
08/08/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/09/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0823-01341
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Activity Conditions - 6
Date Name
08/08/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/08/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/08/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/08/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
08/09/2023 A building permit for the retaining wall is required prior to finalization
08/09/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0823-01341
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Date Description Comments
08/08/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01341
Permite Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
04/08/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required Missing nail plate at garage, pex lines must be 18” away from next soldered joint at soft water and water heater appliances per M2105.10.2, missing cleanouts at water closets per P1 plans, h2.5 clips must be nailed, large duct at living room area not strapped, stopped inspection. More items may be added.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01341
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Completed Inspections - 22
Date Description Inspector Results Comments
01/19/2024 COT - RSPL - Rough Soil Passed
01/19/2024 COT - RSPL - Sewer Passed
01/19/2024 COT - RSPL - Yard Water Line Passed
01/19/2024 COT - RSPL - Backwater Valve Passed
02/08/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
02/08/2024 COT - RSEL - Electrical Underground Passed
02/14/2024 COT - RSBU - Preslab Passed
02/14/2024 COT - RSEL - Grounding/Bonding Passed
03/11/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 3-11-24: Contractor has dry packed under soil plate and added extra bolts to plate. Okay to proceed with dry-in of exterior walls and roof.
03/11/2024 COT - RSBU - Roof Nailing Passed 3-11-24: Contractor has dry packed under soil plate and added extra bolts to plate. Okay to proceed with dry-in of exterior walls and roof.
04/15/2024 BULD - Electrical Clearance Passed TEP ECO Clearance issued.
04/17/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 4-17-24: plumber has lengthened the copper pipe connection to the pex line per the code of 18". Okay to proceed with installation of insulation and drywall for ceilings and walls.
04/24/2024 COT - RSPL - Gas Pressure Test Passed Gas line is under 15# of compressed air with no leaks. Okay to proceed.
04/29/2024 COT - RSBU - Interior Shear Bracing Passed Drywall on interior shear walls is properly installed and secured to the studs per the plan requirements of 4" on edge and 7" in the field. Okay to proceed with tape, texture, and painting.
06/28/2024 COT - BULD - SWG Clearance Passed Gas valves are properly installed in kitchen for stove, laundry room for clothes dryer, in attic for furnace, and garage for water heater.
06/28/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is installed and operational per plan requirements.
07/08/2024 COT - RSPL - Plumbing Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and fully operational. Electrical panel is properly labeled and has GFCI & AFCI Breakers in place. Okay to issue Certificate of Occupancy once all other inspections are complete.
07/08/2024 RSBU - Building Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and fully operational. Electrical panel is properly labeled and has GFCI & AFCI Breakers in place. Okay to issue Certificate of Occupancy once all other inspections are complete.
07/08/2024 COT - RSME - Mechanical Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and fully operational. Electrical panel is properly labeled and has GFCI & AFCI Breakers in place. Okay to issue Certificate of Occupancy once all other inspections are complete.
07/08/2024 ENGR Engineering Final Passed
07/08/2024 RSBU - Building Progress Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and fully operational. Electrical panel is properly labeled and has GFCI & AFCI Breakers in place. Okay to issue Certificate of Occupancy once all other inspections are complete.
07/08/2024 COT - RSEL - Electrical Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and fully operational. Electrical panel is properly labeled and has GFCI & AFCI Breakers in place. Okay to issue Certificate of Occupancy once all other inspections are complete.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-08-08_V1.PDF DOCUMENTS VIEW