Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-0823-01341
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/08/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Missing nail plate at garage, pex lines must be 18” away from next soldered joint at soft water and water heater appliances per M2105.10.2, missing cleanouts at water closets per P1 plans, h2.5 clips must be nailed, large duct at living room area not strapped, stopped inspection. More items may be added. | |
| 04/15/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 4/15/24: Not ready, plumbing has not been corrected at soft water and water heater appliances. Nail plates have been installed, H2.5 clips have been nailed off, and large ductwork in living room has been strapped to the truss. | |
| 04/17/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 4-17-24: plumber has lengthened the copper pipe connection to the pex line per the code of 18". Okay to proceed with installation of insulation and drywall for ceilings and walls. |