Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
1857 S POETRY LN
Apply Date:
09/18/2023
Applicant:
Stephanie Bebee
Description:
PVCS1500 T22-M0040 SFR

Permit Reviews

Permit Number - TC-MDP-0823-01318
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Start Date Submittal Complete Date Status  
09/18/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/20/2023 APPROVED Review Details
11/17/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/20/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0823-01318
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Date Description Comments
09/18/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/20/2023 Post-Tension Inspection Report is required.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0823-01318
Permite Description: PVCS1500 T22-M0040 SFR
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
04/26/2024 COT - RSPL - Plumbing Final N/A Re-inspection required 4/26/24: paint pvc on roof. Cut t and p line minimal 6 inches above finish grade. Missing post tension tag at hose bib.

4/30/24: paint pvc on roof
04/30/2024 RSBU - Building Final N/A Re-inspection required 4/30/24: paint pvc on roof
05/02/2024 ENGR Engineering Final N/A Partial Pass Contractor needs to stall the fence and the DG for landscaping. Contract informed me that they would start working on that on Monday and send me some photos on Monday for a reinspections.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0823-01318
Permit Description: PVCS1500 T22-M0040 SFR
Total Completed Inspections - 23
Date Description Inspector Results Comments
10/09/2023 COT - RSPL - Backwater Valve Passed
10/09/2023 COT - RSPL - Sewer Passed
10/09/2023 COT - RSPL - Rough Soil Passed
10/09/2023 COT - RSPL - Yard Water Line Passed
10/12/2023 COT - RSEL - Electrical Underground Passed
10/12/2023 COT - RSEL - Grounding/Bonding Passed
10/12/2023 COT - RSBU - Preslab Passed
10/12/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
11/01/2023 COT - RSBU - Exterior Clips/Sheathing Passed
11/01/2023 COT - RSBU - Roof Nailing Passed
11/21/2023 COT - RSBU - Interior Shear Bracing Passed
12/11/2023 BULD - Electrical Clearance Passed TEP ECO
01/26/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
01/26/2024 COT - RSPL - Gas Pressure Test Passed
02/22/2024 COT - RSBU - Firewall/Fire Barrier/Firestop Passed
04/19/2024 COT - BULD - SWG Clearance Passed SWG for meter only
04/26/2024 RSBU - Building Progress Passed
04/26/2024 COT - RSME - Mechanical Final Passed
04/26/2024 COT - RSEL - Outdoor Lighting Passed
04/26/2024 COT - RSEL - Electrical Final Passed
04/30/2024 COT - RSPL - Plumbing Final Passed
05/06/2024 RSBU - Building Final Passed Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. AFCI & GFCI breakers are installed in electrical panel for bedrooms, bathrooms, kitchen, laundry room, garage, and exterior outlets. Okay to issue Certificate of Occupancy.
05/07/2024 ENGR Engineering Final Passed Passed and ready for CO

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
FINALCOFO.PDF DOCUMENTS VIEW
PT REPORT LOT 44-2023-11-17_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CBT 44 PP FOR PERMIT_V1.PDF DOCUMENTS VIEW
CBT 44 PT CERT-2023-09-18_V1.PDF DOCUMENTS VIEW