Permit: TC-MDP-0823-01318
Permit Details
Apply Date:
09/18/2023
Applicant:
Stephanie Bebee
Description:
PVCS1500 T22-M0040 SFR
Permit Reviews
Permit Number - TC-MDP-0823-01318
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/18/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/20/2023 | APPROVED |
11/17/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/20/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0823-01318
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Date | Description | Comments |
---|---|---|
09/18/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
09/20/2023 | Post-Tension Inspection Report is required. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0823-01318
Permite Description: PVCS1500 T22-M0040 SFR
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/26/2024 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 4/26/24: paint pvc on roof. Cut t and p line minimal 6 inches above finish grade. Missing post tension tag at hose bib. 4/30/24: paint pvc on roof |
04/30/2024 | RSBU - Building Final | N/A | Re-inspection required | 4/30/24: paint pvc on roof |
05/02/2024 | ENGR Engineering Final | N/A | Partial Pass | Contractor needs to stall the fence and the DG for landscaping. Contract informed me that they would start working on that on Monday and send me some photos on Monday for a reinspections. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0823-01318
Permit Description: PVCS1500 T22-M0040 SFR
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/09/2023 | COT - RSPL - Backwater Valve | Passed | ||
10/09/2023 | COT - RSPL - Sewer | Passed | ||
10/09/2023 | COT - RSPL - Rough Soil | Passed | ||
10/09/2023 | COT - RSPL - Yard Water Line | Passed | ||
10/12/2023 | COT - RSEL - Electrical Underground | Passed | ||
10/12/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
10/12/2023 | COT - RSBU - Preslab | Passed | ||
10/12/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
11/01/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
11/01/2023 | COT - RSBU - Roof Nailing | Passed | ||
11/21/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
12/11/2023 | BULD - Electrical Clearance | Passed | TEP ECO | |
01/26/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
01/26/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
02/22/2024 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
04/19/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
04/26/2024 | RSBU - Building Progress | Passed | ||
04/26/2024 | COT - RSME - Mechanical Final | Passed | ||
04/26/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
04/26/2024 | COT - RSEL - Electrical Final | Passed | ||
04/30/2024 | COT - RSPL - Plumbing Final | Passed | ||
05/06/2024 | RSBU - Building Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Mechanical, electrical, and plumbing fixtures are installed and operational. AFCI & GFCI breakers are installed in electrical panel for bedrooms, bathrooms, kitchen, laundry room, garage, and exterior outlets. Okay to issue Certificate of Occupancy. | |
05/07/2024 | ENGR Engineering Final | Passed | Passed and ready for CO |