Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 05/02/2024 |
ENGR Engineering Final
|
|
Partial Pass |
Contractor needs to stall the fence and the DG for landscaping. Contract informed me that they would start working on that on Monday and send me some photos on Monday for a reinspections. |
| 05/06/2024 |
ENGR Engineering Final
|
|
Partial Pass |
contractor never called or sent photos. I stop bye construction site there’s no DG or the fence has not been started to install it |
| 05/07/2024 |
ENGR Engineering Final
|
|
Passed |
Passed and ready for CO |