Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
08/08/2023
Applicant:
Mark Alteri
Description:
PVCS1500 T22-M0040 SFR

Permit Reviews

Permit Number - TC-MDP-0823-01314
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Start Date Submittal Complete Date Status  
10/17/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/17/2023 APPROVED Review Details
08/09/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/11/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0823-01314
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Date Description Comments
08/09/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/17/2023 Post-Tension Inspection Report is required.
08/09/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/11/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0823-01314
Permit Description: PVCS1500 T22-M0040 SFR
Total Completed Inspections - 23
Date Description Inspector Results Comments
09/01/2023 COT - RSPL - Backwater Valve Passed
09/01/2023 COT - RSPL - Rough Soil Passed
09/01/2023 COT - RSPL - Sewer Passed
09/08/2023 COT - RSBU - Excavation/Rebar/Zoning Passed 9/8/23 passed per letter
09/08/2023 COT - RSBU - Preslab Passed 9/8/23 passed per letter photo attached
09/08/2023 COT - RSEL - Grounding/Bonding Passed
09/08/2023 COT - RSEL - Electrical Underground Passed
10/12/2023 COT - RSBU - Roof Nailing Passed
10/12/2023 COT - RSBU - Exterior Clips/Sheathing Passed
11/07/2023 BULD - Electrical Clearance Passed 2/23/24 ECO sent to TEP
11/21/2023 COT - RSBU - Interior Shear Bracing Passed
12/19/2023 COT - RSPL - Gas Pressure Test Passed
12/20/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12/20/23: Master bath shower pan is under water test. Anchor bolts have been installed in shear wall of master bedroom. Okay to proceed with insulation and drywall installation.
01/11/2024 COT - RSBU - Firewall/Fire Barrier/Firestop Passed
03/04/2024 COT - BULD - SWG Clearance Passed Gas valves are installed at water heater and stove locations, with sediment traps in place. Okay to proceed with gas meter installation and turn on.
04/01/2024 COT - RSEL - Electrical Final Passed Construction, mechanical, plumbing, and electrical are complete. Mechanical, plumbing, and electrical fixtures are installed and operational. AFCI breakers are installed in electrical panel for all circuits. GFCI outlets are installed in kitchen, laundry, bathrooms, and garage. Okay to issue Certificate of Occupancy once all other departments have signed off permit.
04/01/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is properly installed per plans and functioning correctly.
04/01/2024 COT - RSME - Mechanical Final Passed Construction, mechanical, plumbing, and electrical are complete. Mechanical, plumbing, and electrical fixtures are installed and operational. AFCI breakers are installed in electrical panel for all circuits. GFCI outlets are installed in kitchen, laundry, bathrooms, and garage. Okay to issue Certificate of Occupancy once all other departments have signed off permit.
04/01/2024 COT - RSPL - Plumbing Final Passed Construction, mechanical, plumbing, and electrical are complete. Mechanical, plumbing, and electrical fixtures are installed and operational. AFCI breakers are installed in electrical panel for all circuits. GFCI outlets are installed in kitchen, laundry, bathrooms, and garage. Okay to issue Certificate of Occupancy once all other departments have signed off permit.
04/01/2024 COT - RSPL - Yard Water Line Passed Water is connected and operational.
04/01/2024 RSBU - Building Final Passed Construction, mechanical, plumbing, and electrical are complete. Mechanical, plumbing, and electrical fixtures are installed and operational. AFCI breakers are installed in electrical panel for all circuits. GFCI outlets are installed in kitchen, laundry, bathrooms, and garage. Okay to issue Certificate of Occupancy once all other departments have signed off permit.
04/01/2024 RSBU - Building Progress Passed Construction, mechanical, plumbing, and electrical are complete. Mechanical, plumbing, and electrical fixtures are installed and operational. AFCI breakers are installed in electrical panel for all circuits. GFCI outlets are installed in kitchen, laundry, bathrooms, and garage. Okay to issue Certificate of Occupancy once all other departments have signed off permit.
04/01/2024 ENGR Engineering Final Passed No issues

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
PT REPORT LOT 70-2023-10-17_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CBT 70 PP FOR PERMIT_V1.PDF DOCUMENTS VIEW
CBT 70 PT CERT-2023-08-08_V1.PDF DOCUMENTS VIEW