Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0823-01314
Permit Details
Apply Date:
08/08/2023
Applicant:
Mark Alteri
Description:
PVCS1500 T22-M0040 SFR
Permit Reviews
Permit Number - TC-MDP-0823-01314
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/17/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/17/2023 | APPROVED |
08/09/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/11/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0823-01314
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Date | Description | Comments |
---|---|---|
08/09/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
10/17/2023 | Post-Tension Inspection Report is required. | |
08/09/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/11/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0823-01314
Permit Description: PVCS1500 T22-M0040 SFR
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/01/2023 | COT - RSPL - Backwater Valve | Passed | ||
09/01/2023 | COT - RSPL - Rough Soil | Passed | ||
09/01/2023 | COT - RSPL - Sewer | Passed | ||
09/08/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 9/8/23 passed per letter | |
09/08/2023 | COT - RSBU - Preslab | Passed | 9/8/23 passed per letter photo attached | |
09/08/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
09/08/2023 | COT - RSEL - Electrical Underground | Passed | ||
10/12/2023 | COT - RSBU - Roof Nailing | Passed | ||
10/12/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
11/07/2023 | BULD - Electrical Clearance | Passed | 2/23/24 ECO sent to TEP | |
11/21/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
12/19/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
12/20/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 12/20/23: Master bath shower pan is under water test. Anchor bolts have been installed in shear wall of master bedroom. Okay to proceed with insulation and drywall installation. | |
01/11/2024 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
03/04/2024 | COT - BULD - SWG Clearance | Passed | Gas valves are installed at water heater and stove locations, with sediment traps in place. Okay to proceed with gas meter installation and turn on. | |
04/01/2024 | COT - RSEL - Electrical Final | Passed | Construction, mechanical, plumbing, and electrical are complete. Mechanical, plumbing, and electrical fixtures are installed and operational. AFCI breakers are installed in electrical panel for all circuits. GFCI outlets are installed in kitchen, laundry, bathrooms, and garage. Okay to issue Certificate of Occupancy once all other departments have signed off permit. | |
04/01/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is properly installed per plans and functioning correctly. | |
04/01/2024 | COT - RSME - Mechanical Final | Passed | Construction, mechanical, plumbing, and electrical are complete. Mechanical, plumbing, and electrical fixtures are installed and operational. AFCI breakers are installed in electrical panel for all circuits. GFCI outlets are installed in kitchen, laundry, bathrooms, and garage. Okay to issue Certificate of Occupancy once all other departments have signed off permit. | |
04/01/2024 | COT - RSPL - Plumbing Final | Passed | Construction, mechanical, plumbing, and electrical are complete. Mechanical, plumbing, and electrical fixtures are installed and operational. AFCI breakers are installed in electrical panel for all circuits. GFCI outlets are installed in kitchen, laundry, bathrooms, and garage. Okay to issue Certificate of Occupancy once all other departments have signed off permit. | |
04/01/2024 | COT - RSPL - Yard Water Line | Passed | Water is connected and operational. | |
04/01/2024 | RSBU - Building Final | Passed | Construction, mechanical, plumbing, and electrical are complete. Mechanical, plumbing, and electrical fixtures are installed and operational. AFCI breakers are installed in electrical panel for all circuits. GFCI outlets are installed in kitchen, laundry, bathrooms, and garage. Okay to issue Certificate of Occupancy once all other departments have signed off permit. | |
04/01/2024 | RSBU - Building Progress | Passed | Construction, mechanical, plumbing, and electrical are complete. Mechanical, plumbing, and electrical fixtures are installed and operational. AFCI breakers are installed in electrical panel for all circuits. GFCI outlets are installed in kitchen, laundry, bathrooms, and garage. Okay to issue Certificate of Occupancy once all other departments have signed off permit. | |
04/01/2024 | ENGR Engineering Final | Passed | No issues |