Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
08/08/2023
Applicant:
Amy Stokes, Operations Accountant
Description:
SFR RKK35G T21-M0090

Permit Reviews

Permit Number - TC-MDP-0823-01312
Permit Status: Inspections complete
Permit Description: SFR RKK35G T21-M0090
Start Date Submittal Complete Date Status  
08/08/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/09/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0823-01312
Permit Status: Inspections complete
Permit Description: SFR RKK35G T21-M0090
Total Outstanding Activity Conditions - 5
Date Name
08/08/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/08/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/08/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/08/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
08/09/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0823-01312
Permit Status: Inspections complete
Permit Description: SFR RKK35G T21-M0090
Date Description Comments
08/02/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01312
Permit Description: SFR RKK35G T21-M0090
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/18/2023 COT - RSPL - Yard Water Line Passed
09/18/2023 COT - RSPL - Sewer Passed
09/18/2023 COT - RSPL - Rough Soil Passed 9/18/23: rough soil approved.
09/26/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
09/26/2023 COT - RSBU - Preslab Passed
09/26/2023 COT - RSEL - Electrical Underground Passed
09/26/2023 COT - RSEL - Grounding/Bonding Passed
10/13/2023 COT - RSBU - Roof Nailing Passed
10/13/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
11/16/2023 COT - RSPL - Gas Pressure Test Passed
11/16/2023 BULD - Electrical Clearance Passed 11/16/23: TEP ECO
12/22/23 clearance resent
12/14/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
01/02/2024 COT - RSBU - Interior Shear Bracing Passed
03/04/2024 COT - BULD - SWG Clearance Passed SWG for meter only
03/04/2024 COT - RSEL - Outdoor Lighting Passed
03/04/2024 COT - RSME - Mechanical Final Passed
03/04/2024 COT - RSPL - Plumbing Final Passed
03/04/2024 RSBU - Building Progress Passed
03/05/2024 COT - RSEL - Electrical Final Passed
03/05/2024 RSBU - Building Final Passed
06/10/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-08-08_V1.PDF DOCUMENTS VIEW