Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 11/16/23: install mud ring at Ufer, block registers, east bathroom has S-trap at vanity, fresh air intake is within 10 feet of a vent, support both ends of 4-gang box, plans call for 2x6 framing at all exterior plumbing walls. Contact Engineer of Record on framing fix. INSPECTION STOPPED. MORE ITEMS MAY BE ADDED AT NEXT INSPECTION. | ||
| 11/22/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required (with fee) | 11/16/23: install mud ring at Ufer, block registers, east bathroom has S-trap at vanity, fresh air intake is within 10 feet of a vent, support both ends of 4-gang box, plans call for 2x6 framing at all exterior plumbing walls. Contact Engineer of Record on framing fix. INSPECTION STOPPED. MORE ITEMS MAY BE ADDED AT NEXT INSPECTION. 11/22/23: correction list from 11/16/23 is incomplete. A refee was applied to this permit. |
|
| 12/14/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |