Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 11/16/23: install mud ring at Ufer, block registers, east bathroom has S-trap at vanity, fresh air intake is within 10 feet of a vent, support both ends of 4-gang box, plans call for 2x6 framing at all exterior plumbing walls. Contact Engineer of Record on framing fix. INSPECTION STOPPED. MORE ITEMS MAY BE ADDED AT NEXT INSPECTION.
11/22/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required (with fee) 11/16/23: install mud ring at Ufer, block registers, east bathroom has S-trap at vanity, fresh air intake is within 10 feet of a vent, support both ends of 4-gang box, plans call for 2x6 framing at all exterior plumbing walls. Contact Engineer of Record on framing fix. INSPECTION STOPPED. MORE ITEMS MAY BE ADDED AT NEXT INSPECTION.

11/22/23: correction list from 11/16/23 is incomplete. A refee was applied to this permit.
12/14/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed