Permit: TC-MDP-0725-00395
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6466 E PASEO ALGA
Address NEW:
6466 E PASEO ALGA
Apply Date:
07/29/2025
Applicant:
Brianna Quiroz
Description:
SFR 470 Great Sand Dunes Model Plan La Estancia Blocks 6, 7, 8 (Model master plan TC-MDP-1222-00050)
Permit Reviews
Permit Number - TC-MDP-0725-00395
Permit Status: Complete
Permit Description: SFR 470 Great Sand Dunes Model Plan La Estancia Blocks 6, 7, 8 (Model master plan TC-MDP-1222-00050)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/31/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 08/07/2025 | APPROVED |
| 04/14/2026 | SPECIAL INSPECTION REVIEW v.1 | 04/14/2026 | APPROVED |
Conditions
Permit Number - TC-MDP-0725-00395
Permit Status: Complete
Permit Description: SFR 470 Great Sand Dunes Model Plan La Estancia Blocks 6, 7, 8 (Model master plan TC-MDP-1222-00050)
| Date | Description | Comments |
|---|---|---|
| 08/05/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 07/18/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 07/18/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 08/05/2025 | Post-Installed Anchor Inspection Report is required. | |
| 08/05/2025 | Post-Tension Inspection Report is required. | |
| 07/18/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 07/18/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 08/05/2025 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0725-00395
Permite Description: SFR 470 Great Sand Dunes Model Plan La Estancia Blocks 6, 7, 8 (Model master plan TC-MDP-1222-00050)
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/01/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 10/01/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 11/17/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Canceled | 11.17.2025 Canceled by contractor. |
| 12/01/2025 | COT - RSBU - Interior Shear Bracing | N/A | Re-inspection required | 12-1-25: screws at the southeast bedroom must be secured by manufactured specifications. Screws must be installed 3/8" from edge and 3/4" maximum. Screws in this case are installed to the framing members above 1" and screws are required at the edge from the measurements provided. CORRECTION- SCREWS ARE REQUIRED AT 1/2” & 5/8” MAXIMUM. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0725-00395
Permit Description: SFR 470 Great Sand Dunes Model Plan La Estancia Blocks 6, 7, 8 (Model master plan TC-MDP-1222-00050)
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/01/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 10/01/2025 | COT - RSPL - Rough Soil | Passed | ||
| 10/01/2025 | COT - RSPL - Sewer | Passed | ||
| 10/06/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 10/06/2025 | COT - RSBU - Preslab | Passed | ||
| 10/06/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/31/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 10.31.2025 Approved per plan. |
|
| 10/31/2025 | COT - RSBU - Roof Nailing | Passed | 10.31.2025 Approved per plan. |
|
| 11/07/2025 | BULD - Electrical Clearance | Passed | 11.07.2025 Clearance TEP ECO. |
|
| 11/17/2025 | COT - RSPL - Yard Water Line | Passed | 11.17.2025 Approved and under test to meter. |
|
| 11/18/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 11.18.2025 Approved per plan, added foam and secured future solar conduit and penetration. |
|
| 12/02/2025 | COT - RSBU - Interior Shear Bracing | Passed | 12-2-25: interior shear bracing approved-okay to tape & texture. | |
| 04/23/2026 | COT - RSEL - Electrical Final | Passed | ||
| 04/23/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 04/23/2026 | COT - RSME - Mechanical Final | Passed | ||
| 04/23/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 04/23/2026 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. | |
| 04/23/2026 | RSBU - Building Final | Passed | ||
| 04/23/2026 | RSBU - Building Progress | Passed |