Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Model Building Permit
Address NEW:
6117 E CAMPOLINA TR
Apply Date:
07/09/2025
Applicant:
Cindy Nemo
Description:
Blackhawk T933 - Beech (Model master plan TC-MDP-0923-01493)

Permit Reviews

Permit Number - TC-MDP-0725-00379
Permit Status: Inspections
Permit Description: Blackhawk T933 - Beech (Model master plan TC-MDP-0923-01493)
Start Date Submittal Complete Date Status  
07/09/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 07/09/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0725-00379
Permit Status: Inspections
Permit Description: Blackhawk T933 - Beech (Model master plan TC-MDP-0923-01493)
Total Outstanding Activity Conditions - 4
Date Name
07/02/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
07/02/2025 Post-Tension Inspection Report is required.
07/02/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
07/09/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.

Conditions

Permit Number - TC-MDP-0725-00379
Permit Status: Inspections
Permit Description: Blackhawk T933 - Beech (Model master plan TC-MDP-0923-01493)
Date Description Comments
07/09/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
07/02/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0725-00379
Permite Description: Blackhawk T933 - Beech (Model master plan TC-MDP-0923-01493)
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
05/08/2026 COT - RSEL - Grounding/Bonding N/A Partial Pass 05/08/2026
Ufer only.
07/27/2026 COT - RSEL - Electrical Final N/A Not Ready Coat all exterior plastic pipes. Threshold at garage shall be ADA standard. Hot water heater pipe shall be insulated with R3 insulation. Running water at primary bathroom lav. Provide refrigerant caps at condenser unit. Ensure unit is leveled. T stat shall be at 48”. AAV at kitchen requires aces panel. 7/27/2026AAV at kitchen requires access panel. Front Door handle not properly installed. 7/27/2026
07/27/2026 COT - RSME - Mechanical Final N/A Not Ready Coat all exterior plastic pipes. Threshold at garage shall be ADA standard. Hot water heater pipe shall be insulated with R3 insulation. Running water at primary bathroom lav. Provide refrigerant caps at condenser unit. Ensure unit is leveled. T stat shall be at 48”. AAV at kitchen requires aces panel. 7/27/2026AAV at kitchen requires access panel. Front Door handle not properly installed. 7/27/2026
07/27/2026 COT - RSPL - Plumbing Final N/A Not Ready Coat all exterior plastic pipes. Threshold at garage shall be ADA standard. Hot water heater pipe shall be insulated with R3 insulation. Running water at primary bathroom lav. Provide refrigerant caps at condenser unit. Ensure unit is leveled. T stat shall be at 48”. AAV at kitchen requires aces panel. 7/27/2026AAV at kitchen requires access panel. Front Door handle not properly installed. 7/27/2026
07/27/2026 RSBU - Building Final N/A Not Ready Coat all exterior plastic pipes. Threshold at garage shall be ADA standard. Hot water heater pipe shall be insulated with R3 insulation. Running water at primary bathroom lav. Provide refrigerant caps at condenser unit. Ensure unit is leveled. T stat shall be at 48”. AAV at kitchen requires aces panel. 7/27/2026AAV at kitchen requires access panel. Front Door handle not properly installed. 7/27/2026
08/06/2026 ENGR Engineering Final N/A Partial Pass Site is complete in accordance with approved plans. Outstanding conditions prevent full pass of Final inspection.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0725-00379
Permit Description: Blackhawk T933 - Beech (Model master plan TC-MDP-0923-01493)
Total Completed Inspections - 18
Date Description Inspector Results Comments
04/30/2026 COT - RSPL - Rough Soil Passed 04/30/2026
Holding under test. Okay to backfill, shading required.
04/30/2026 COT - RSPL - Sewer Passed 04/30/2026
Holding under test with green tracer wire to HCS. Okay to backfill, shading required.
04/30/2026 COT - RSPL - Yard Water Line Passed 04/30/2026
Holding under test with blue tracer wire from meter to riser with PRV. Okay to backfill, shading required.
05/08/2026 COT - RSBU - Excavation/Rebar/Zoning Passed 05/08/2026
Approved per plan and reinforcements, ok to pour.
05/08/2026 COT - RSBU - Preslab Passed 05/08/2026
Approved per plan and reinforcements, ok to pour.
05/08/2026 COT - RSEL - Electrical Underground Passed
05/21/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Passed 5/21/26
05/21/2026 COT - RSBU - Roof Nailing Passed Passed 5/21/26
06/02/2026 COT - RSEL - Grounding/Bonding Passed approved
06/02/2026 BULD - Electrical Clearance Passed Eco approved
06/02/2026 COT - RSPL - Gas Pressure Test Passed
06/04/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/12/2026 COT - RSBU - Interior Shear Bracing Passed
07/24/2026 COT - BULD - SWG Clearance Passed 7-24-26 SWG Clearance approved
07/27/2026 COT - RSEL - Outdoor Lighting Passed
07/27/2026 RSBU - Building Progress Passed
08/06/2026 COT - RSEL - Electrical Final Passed 8-6-26: electrical final approved.
08/06/2026 COT - RSME - Mechanical Final Passed 8-6-26: mechanical final approved.

Documents

File Name Document Type  
BLACKHAWK RANCH LOT 33-START_V1.PDF DOCUMENTS VIEW
BLACKHAWK- T933 SPECIAL-INSPECTION-CERTIFICATE-6117 S CAMPOLINA TR-2025-07-09_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW