Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: TC-MDP-0725-00379

Parcel: 140442810


Addresses:

6117 E CAMPOLINA TR

Inspection Status: Not Ready

Inspection History: COT - RSPL - Plumbing Final 

Date Description Inspector Results Comments
07/27/2026 COT - RSPL - Plumbing Final  Not Ready Coat all exterior plastic pipes. Threshold at garage shall be ADA standard. Hot water heater pipe shall be insulated with R3 insulation. Running water at primary bathroom lav. Provide refrigerant caps at condenser unit. Ensure unit is leveled. T stat shall be at 48”. AAV at kitchen requires aces panel. 7/27/2026AAV at kitchen requires access panel. Front Door handle not properly installed. 7/27/2026
08/06/2026 COT - RSPL - Plumbing Final  Re-inspection required 8-6-26: provide video/pictures of Boston loop or remove section so that we may inspect and verify.