Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - RSPL - Plumbing Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/27/2026 | COT - RSPL - Plumbing Final | Not Ready | Coat all exterior plastic pipes. Threshold at garage shall be ADA standard. Hot water heater pipe shall be insulated with R3 insulation. Running water at primary bathroom lav. Provide refrigerant caps at condenser unit. Ensure unit is leveled. T stat shall be at 48”. AAV at kitchen requires aces panel. 7/27/2026AAV at kitchen requires access panel. Front Door handle not properly installed. 7/27/2026 | |
| 08/06/2026 | COT - RSPL - Plumbing Final | Re-inspection required | 8-6-26: provide video/pictures of Boston loop or remove section so that we may inspect and verify. | |
| 11/03/2026 | COT - RSPL - Plumbing Final | Passed | 11/03/2026 Verified Boston loop. |