Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
926 N MONTEZUMA AV
Apply Date:
07/29/2024
Applicant:
Description:
GGV ADU MP 002

Permit Reviews

Permit Number - TC-MDP-0724-00837
Permit Status: Complete
Permit Description: GGV ADU MP 002
Start Date Submittal Complete Date Status  
10/08/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/09/2025 APPROVED Review Details
04/18/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/23/2025 APPROVED Review Details
07/31/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 08/20/2024 REQUIRES RESUBMIT Review Details
08/29/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 09/18/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0724-00837
Permit Status: Complete
Permit Description: GGV ADU MP 002
Date Description Comments
07/25/2024 This project appears to be for an ADU. Units 2 must be assigned to the Permit Application and Plans before the Certificate of Occupancy (C of O) is issued. Please log into your TDC account and submit a request for an address change to update. Please submit approved plans without our City stamps (include the primary address and Unit 2 on plan). Along with a Comment Response, stating that this is a re-stamp to resolve the addressing issue.
09/18/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
07/25/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/25/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0724-00837
Permite Description: GGV ADU MP 002
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
11/05/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Partial Pass Electric and plumbing only. No mechanical system in place.
04/25/2025 COT - BULD - SWG Clearance N/A Not Applicable
12/11/2024 COT - RSEL - Electrical Final N/A Re-inspection required Re-inspection required--hold on permit for elevation certificate.
12/11/2024 COT - RSME - Mechanical Final N/A Re-inspection required Re-inspection required--hold on permit for elevation certificate.
04/25/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable
12/11/2024 COT - RSPL - Plumbing Final N/A Re-inspection required Re-inspection required--hold on permit for elevation certificate.
12/11/2024 RSBU - Building Final N/A Re-inspection required Re-inspection required--hold on permit for elevation certificate.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0724-00837
Permit Description: GGV ADU MP 002
Total Completed Inspections - 19
Date Description Inspector Results Comments
10/17/2024 COT - RSBU - Preslab Passed
10/31/2024 COT - RSBU - Roof Nailing Passed OK to dry-in roof system
10/31/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed OK to cover exterior walls.
10/31/2024 COT - RSBU - Interior Shear Bracing Passed
11/05/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
11/14/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Ok to cover interior walls.
12/10/2024 BULD - Electrical Clearance Passed
12/10/2024 COT - RSEL - Electrical Underground Passed Corrections were made. Okay to backfill. Shading required. 12/10/2024
12/10/2024 COT - RSEL - Outdoor Lighting Passed
12/10/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading is required. 12/10/2024
12/10/2024 COT - RSPL - Sewer Passed Corrections were made. Okay to backfill. Shading required. 12/10/2024
12/10/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading is required. 12/10/2024
12/10/2024 RSBU - Building Progress Passed
12/11/2024 ENGR Engineering Final Passed
12/11/2024 COT - RSEL - Grounding/Bonding Passed
04/25/2025 COT - RSEL - Electrical Final Passed Approved. Elevation certificate has been uploaded. 4/25/2025
04/25/2025 COT - RSME - Mechanical Final Passed Approved. Elevation certificate has been uploaded. 4/25/2025
04/25/2025 COT - RSPL - Plumbing Final Passed Approved. Elevation certificate has been uploaded. 4/25/2025
04/25/2025 RSBU - Building Final Passed Approved. Elevation certificate has been uploaded. 4/25/2025

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
TE-FPU-0924-00277_FINAL_ELEVATION_CERTIFICATE.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW