Permit: TC-MDP-0724-00821
Permit Details
Apply Date:
09/12/2024
Applicant:
Celina Rodriguez
Description:
Bella Tierra Phase 3 1745-130
Permit Reviews
Permit Number - TC-MDP-0724-00821
Permit Status: Inspections
Permit Description: Bella Tierra Phase 3 1745-130
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/13/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/18/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0724-00821
Permit Status: Inspections
Permit Description: Bella Tierra Phase 3 1745-130
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
07/25/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
09/17/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
09/17/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
09/17/2024 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0724-00821
Permit Status: Inspections
Permit Description: Bella Tierra Phase 3 1745-130
Date | Description | Comments |
---|---|---|
07/25/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0724-00821
Permite Description: Bella Tierra Phase 3 1745-130
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/23/2024 | COT - RSEL - Grounding/Bonding | N/A | Partial Pass | Concrete forms are set, post tension cabling is properly spaced, rebar reinforcement is installed per plan, Ufer ground is in place, hold downs and masa clips are secured to form per plan requirements, underground electrical is in place for kitchen island, and all underground plumbing pipes coming through slab are properly wrapped with foam. Okay to proceed with concrete pour. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0724-00821
Permit Description: Bella Tierra Phase 3 1745-130
Total Completed Inspections - 13
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/17/2024 | COT - RSPL - Rough Soil | Passed | 10-17-24, underground plumbing per approved plans. Okay to backfill-provide shading.Main water line also approved.okay to backfill with shading. | |
10/17/2024 | COT - RSPL - Sewer | Passed | 10-17-24, underground plumbing per approved plans. Okay to backfill-provide shading.Main water line also approved.okay to backfill with shading. | |
10/17/2024 | COT - RSPL - Yard Water Line | Passed | 10-17-24, underground plumbing per approved plans. Okay to backfill-provide shading.Main water line also approved.okay to backfill with shading. | |
10/23/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is properly spaced, rebar reinforcement is installed per plan, Ufer ground is in place, hold downs and masa clips are secured to form per plan requirements, underground electrical is in place for kitchen island, and all underground plumbing pipes coming through slab are properly wrapped with foam. Okay to proceed with concrete pour. | |
10/23/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is properly spaced, rebar reinforcement is installed per plan, Ufer ground is in place, hold downs and masa clips are secured to form per plan requirements, underground electrical is in place for kitchen island, and all underground plumbing pipes coming through slab are properly wrapped with foam. Okay to proceed with concrete pour. | |
10/23/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is properly spaced, rebar reinforcement is installed per plan, Ufer ground is in place, hold downs and masa clips are secured to form per plan requirements, underground electrical is in place for kitchen island, and all underground plumbing pipes coming through slab are properly wrapped with foam. Okay to proceed with concrete pour. | |
11/08/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | 11-8-24: Items noted on the 11-1-24 inspection have been corrected and completed. Okay to proceed with mechanical, electrical, and plumbing rough in work. | |
11/08/2024 | COT - RSBU - Roof Nailing | Passed | 11-8-24: Okay to proceed with mechanical, electrical, and plumbing rough in work. | |
12/03/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
12/04/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 12/4/24: All items noted on the 12-3-24 inspection has been corrected and completed. Okay to proceed with insulation and drywall installation. | |
12/20/2024 | COT - RSBU - Interior Shear Bracing | Passed | 12/20/24 nailing per plan | |
01/07/2025 | BULD - Electrical Clearance | Passed | 01/07/25 TEP CLEARANCE: ECO |
|
01/31/2025 | COT - BULD - SWG Clearance | Passed | 1/31/25 approval for SWG clearance |