Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
09/12/2024
Applicant:
Celina Rodriguez
Description:
Bella Tierra Phase 3 1745-130

Permit Reviews

Permit Number - TC-MDP-0724-00821
Permit Status: Inspections
Permit Description: Bella Tierra Phase 3 1745-130
Start Date Submittal Complete Date Status  
09/13/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/18/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0724-00821
Permit Status: Inspections
Permit Description: Bella Tierra Phase 3 1745-130
Total Outstanding Activity Conditions - 4
Date Name
07/25/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
09/17/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/17/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/17/2024 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0724-00821
Permit Status: Inspections
Permit Description: Bella Tierra Phase 3 1745-130
Date Description Comments
07/25/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0724-00821
Permite Description: Bella Tierra Phase 3 1745-130
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
10/23/2024 COT - RSEL - Grounding/Bonding N/A Partial Pass Concrete forms are set, post tension cabling is properly spaced, rebar reinforcement is installed per plan, Ufer ground is in place, hold downs and masa clips are secured to form per plan requirements, underground electrical is in place for kitchen island, and all underground plumbing pipes coming through slab are properly wrapped with foam. Okay to proceed with concrete pour.
11/01/2024 COT - RSBU - Exterior Clips/Sheathing N/A Re-inspection required 11-1-24, add shot pins to marked areas of interior framing walls, add anchor bolt to marked area located on southside of home, loose interior shear/ over penetrating nails at bedroom 2. Stopped inspection-additional items may be noted.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0724-00821
Permit Description: Bella Tierra Phase 3 1745-130
Total Completed Inspections - 6
Date Description Inspector Results Comments
10/17/2024 COT - RSPL - Rough Soil Passed 10-17-24, underground plumbing per approved plans. Okay to backfill-provide shading.Main water line also approved.okay to backfill with shading.
10/17/2024 COT - RSPL - Sewer Passed 10-17-24, underground plumbing per approved plans. Okay to backfill-provide shading.Main water line also approved.okay to backfill with shading.
10/17/2024 COT - RSPL - Yard Water Line Passed 10-17-24, underground plumbing per approved plans. Okay to backfill-provide shading.Main water line also approved.okay to backfill with shading.
10/23/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, post tension cabling is properly spaced, rebar reinforcement is installed per plan, Ufer ground is in place, hold downs and masa clips are secured to form per plan requirements, underground electrical is in place for kitchen island, and all underground plumbing pipes coming through slab are properly wrapped with foam. Okay to proceed with concrete pour.
10/23/2024 COT - RSBU - Preslab Passed Concrete forms are set, post tension cabling is properly spaced, rebar reinforcement is installed per plan, Ufer ground is in place, hold downs and masa clips are secured to form per plan requirements, underground electrical is in place for kitchen island, and all underground plumbing pipes coming through slab are properly wrapped with foam. Okay to proceed with concrete pour.
10/23/2024 COT - RSEL - Electrical Underground Passed Concrete forms are set, post tension cabling is properly spaced, rebar reinforcement is installed per plan, Ufer ground is in place, hold downs and masa clips are secured to form per plan requirements, underground electrical is in place for kitchen island, and all underground plumbing pipes coming through slab are properly wrapped with foam. Okay to proceed with concrete pour.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 56 START_V1.PDF DOCUMENTS VIEW
BTIII 56 SIC-2024-09-12_V1.PDF DOCUMENTS VIEW