Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-0724-00821
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/03/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Seal exterior penetrations. Fire foam top penetrations. Secure gas line In master bedroom. Add support at elbow. Block register in master closet. Secure vertical vent pipes. Receptacle in first bathroom is not made up and seems to be tied into kitchen circuits. Tape sheathing for EV charger that's been damaged. Add staple to electrical line in kitchen near hood. Add screws for fan boxes. Shot pins still required in hallway. Short number of circuits at main panel. STOPPED INSPECTION. Other items may occur. 12/3/2024 | |
12/04/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 12/4/24: All items noted on the 12-3-24 inspection has been corrected and completed. Okay to proceed with insulation and drywall installation. |