Permit: TC-MDP-0724-00816
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
4711 S VERDIN VALLEY DR
Address NEW:
4711 S VERDIN VALLEY DR
Apply Date:
10/17/2024
Applicant:
Celina Rodriguez
Description:
Bella Tierra Phase 3 1745-130
Permit Reviews
Permit Number - TC-MDP-0724-00816
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/24/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 11/12/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0724-00816
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 07/25/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 10/28/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 10/28/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 10/28/2024 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0724-00816
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
| Date | Description | Comments |
|---|---|---|
| 07/25/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0724-00816
Permite Description: Bella Tierra Phase 3 1745-130
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/07/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 12/31/24 LUS24's needed at 2x6 on covered back patio. Anchor bolts must be secured, have framer walk through and check. 01/07/25 1. All SW11 or greater shear wall require anchor bolts with .0229"x3"x3" plate washer. 2. Patio not built per plan; the east beam should be a 6"x8" and pocket into wall; plans also call for BC6 post caps SE and SW posts. |
| 01/10/2025 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 01/10/25 1. Missing BC6 post caps. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0724-00816
Permit Description: Bella Tierra Phase 3 1745-130
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/14/2024 | COT - RSPL - Rough Soil | Passed | 11-14-24, sewer not connected. Underground plumbing and main water line approved. Okay to backfill but reschedule sewer connection when ready. | |
| 11/14/2024 | COT - RSPL - Yard Water Line | Passed | 11-14-24, sewer not connected. Underground plumbing and main water line approved. Okay to backfill but reschedule sewer connection when ready. | |
| 12/04/2024 | COT - RSPL - Sewer | Passed | 12/4/24: Underground plumbing is connected to main sewer line with green tracer wire. Okay to shade pipe and backfill trenches. | |
| 12/10/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 12-10-24, excavation/setbacks approved. | |
| 12/10/2024 | COT - RSBU - Preslab | Passed | 12-10-24, preslab, underground electric, and bonding all approved. Okay to pour concrete. | |
| 12/10/2024 | COT - RSEL - Electrical Underground | Passed | 12-10-24, preslab, underground electric, and bonding all approved. Okay to pour concrete. | |
| 12/10/2024 | COT - RSEL - Grounding/Bonding | Passed | 12-10-24, preslab, underground electric, and grounding/bonding all approved. Okay to pour concrete. | |
| 01/10/2025 | COT - RSBU - Interior Shear Bracing | Passed | 01/10/25 1. Missing BC6 post caps. |
|
| 01/13/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 1/13/25: All issues from other inspections have been resolved and corrected. Okay to proceed with other work. | |
| 01/13/2025 | COT - RSBU - Roof Nailing | Passed | 1/13/25: All issues from other inspections have been resolved and corrected. Okay to proceed with other work. | |
| 01/23/2025 | BULD - Electrical Clearance | Passed | 1-23-25, panel approved to be energized. ECO clearance issued to TEP | |
| 02/05/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 2-5-25, residential intermediate inspection approved plans. Okay to continue with construction. | |
| 02/05/2025 | COT - RSPL - Gas Pressure Test | Passed | 2-5-25, approved. | |
| 03/27/2025 | COT - BULD - SWG Clearance | Passed | 27 March 25 SOUTHWEST GAS CLEARANCE: SWG |
|
| 04/14/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed 4/14/25 | |
| 04/14/2025 | COT - RSME - Mechanical Final | Passed | Passed 4/14/25 | |
| 04/14/2025 | COT - RSPL - Plumbing Final | Passed | Passed 4/14/25 | |
| 04/14/2025 | RSBU - Building Progress | Passed | Passed 4/14/25 | |
| 04/16/2025 | COT - RSEL - Electrical Final | Passed | 4/16/25 corrections made | |
| 04/16/2025 | RSBU - Building Final | Passed | 4/16/25 corrections made | |
| 04/16/2025 | ENGR Engineering Final | Passed |