Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
2752 N EDITH BL UNIT 2
Apply Date:
07/24/2024
Applicant:
Jennifer Ravia
Description:
Casita 1-Bedroom Model Plan 2 versions: option 1 studio, option 2 one bedroom

Permit Reviews

Permit Number - TC-MDP-0724-00810
Permit Status: Complete
Permit Description: Casita 1-Bedroom Model Plan 2 versions: option 1 studio, option 2 one bedroom
Start Date Submittal Complete Date Status  
08/28/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 09/11/2024 APPROVED Review Details
07/26/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 08/13/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-0724-00810
Permit Status: Complete
Permit Description: Casita 1-Bedroom Model Plan 2 versions: option 1 studio, option 2 one bedroom
Date Description Comments
09/05/2024 Provide elevation measurements for Next Upstream Manhole cover and Finished Floor Elevation. Provide Backwater valve protection as/if required. Backwater valve protection: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/building-code/2018_-_irc_amendments.pdf Section P3008.1
09/11/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
07/23/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0724-00810
Permite Description: Casita 1-Bedroom Model Plan 2 versions: option 1 studio, option 2 one bedroom
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
03/14/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable
03/14/2025 COT - BULD - SWG Clearance N/A Not Applicable
03/19/2025 BULD - Electrical Clearance N/A Not Applicable
02/19/2025 COT - RSBU - Roof Nailing N/A Re-inspection required 2-19-25, unable to to verify roof nailing. Roofing company dried in roof prior to city approval. Have roofing company provide a letter indicating that nailing was done per approved plans and meets requirements set forth in the 2028 International Residential Code. Submit letter as an attachment to city portal for review and approval.
05/19/2025 COT - RSPL - Backwater Valve N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0724-00810
Permit Description: Casita 1-Bedroom Model Plan 2 versions: option 1 studio, option 2 one bedroom
Total Completed Inspections - 18
Date Description Inspector Results Comments
11/27/2024 COT - RSPL - Rough Soil Passed Plumbing under slab approved. Okay to backfill progress areas. Shading required. 11/27/2024
12/11/2024 COT - RSBU - Preslab and floodplain Passed
12/11/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Approved. Okay for concrete placement. 12/11/2024
12/24/2024 RSBU - Building Progress Passed cmu wall 3rd course approved.
01/23/2025 COT - RSEL - Electrical Underground Passed
01/24/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
03/14/2025 COT - RSPL - Yard Water Line Passed
03/14/2025 COT - RSPL - Sewer Passed
03/24/2025 COT - RSBU - Roof Nailing Passed 2-19-25, unable to to verify roof nailing. Roofing company dried in roof prior to city approval. Have roofing company provide a letter indicating that nailing was done per approved plans and meets requirements set forth in the 2028 International Residential Code. Submit letter as an attachment to city portal for review and approval.
3/24/25: approved per GA
03/28/2025 COT - RSEL - Grounding/Bonding Passed Grounding and bonding per code 3/28/25
03/28/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 3/28/25 corrections made
05/19/2025 COT - RSBU - Interior Shear Bracing Passed
06/25/2025 COT - RSEL - Outdoor Lighting Passed 6-25-25: outdoor lighting approved.
07/16/2025 COT - RSEL - Electrical Final Passed 7.16.25 corrections made
07/16/2025 COT - RSME - Mechanical Final Passed 7.16.25 corrections made
07/16/2025 ENGR Engineering Final Passed
07/21/2025 COT - RSPL - Plumbing Final Passed
07/29/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
RAVIA FINAL FUP ELEVATION CERTIFICATE_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
08.22.24_2752 N EDITH BLVD_SITE PLAN_REVISED_V2.PDF DOCUMENTS VIEW