Permit: TC-MDP-0724-00810
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
2752 N EDITH BL UNIT 2
Address NEW:
2752 N EDITH BL UNIT 2
Apply Date:
07/24/2024
Applicant:
Jennifer Ravia
Description:
Casita 1-Bedroom Model Plan 2 versions: option 1 studio, option 2 one bedroom
Permit Reviews
Permit Number - TC-MDP-0724-00810
Permit Status: Complete
Permit Description: Casita 1-Bedroom Model Plan
2 versions: option 1 studio, option 2 one bedroom
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/28/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 09/11/2024 | APPROVED |
| 07/26/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 08/13/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0724-00810
Permit Status: Complete
Permit Description: Casita 1-Bedroom Model Plan
2 versions: option 1 studio, option 2 one bedroom
| Date | Description | Comments |
|---|---|---|
| 09/05/2024 | Provide elevation measurements for Next Upstream Manhole cover and Finished Floor Elevation. Provide Backwater valve protection as/if required. Backwater valve protection: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/building-code/2018_-_irc_amendments.pdf Section P3008.1 | |
| 09/11/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 07/23/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0724-00810
Permite Description: Casita 1-Bedroom Model Plan
2 versions: option 1 studio, option 2 one bedroom
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/14/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 03/14/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 03/19/2025 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 02/19/2025 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 2-19-25, unable to to verify roof nailing. Roofing company dried in roof prior to city approval. Have roofing company provide a letter indicating that nailing was done per approved plans and meets requirements set forth in the 2028 International Residential Code. Submit letter as an attachment to city portal for review and approval. |
| 05/19/2025 | COT - RSPL - Backwater Valve | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0724-00810
Permit Description: Casita 1-Bedroom Model Plan
2 versions: option 1 studio, option 2 one bedroom
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/27/2024 | COT - RSPL - Rough Soil | Passed | Plumbing under slab approved. Okay to backfill progress areas. Shading required. 11/27/2024 | |
| 12/11/2024 | COT - RSBU - Preslab and floodplain | Passed | ||
| 12/11/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Approved. Okay for concrete placement. 12/11/2024 | |
| 12/24/2024 | RSBU - Building Progress | Passed | cmu wall 3rd course approved. | |
| 01/23/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 01/24/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 03/14/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 03/14/2025 | COT - RSPL - Sewer | Passed | ||
| 03/24/2025 | COT - RSBU - Roof Nailing | Passed | 2-19-25, unable to to verify roof nailing. Roofing company dried in roof prior to city approval. Have roofing company provide a letter indicating that nailing was done per approved plans and meets requirements set forth in the 2028 International Residential Code. Submit letter as an attachment to city portal for review and approval. 3/24/25: approved per GA |
|
| 03/28/2025 | COT - RSEL - Grounding/Bonding | Passed | Grounding and bonding per code 3/28/25 | |
| 03/28/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 3/28/25 corrections made | |
| 05/19/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 06/25/2025 | COT - RSEL - Outdoor Lighting | Passed | 6-25-25: outdoor lighting approved. | |
| 07/16/2025 | COT - RSEL - Electrical Final | Passed | 7.16.25 corrections made | |
| 07/16/2025 | COT - RSME - Mechanical Final | Passed | 7.16.25 corrections made | |
| 07/16/2025 | ENGR Engineering Final | Passed | ||
| 07/21/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 07/29/2025 | RSBU - Building Final | Passed |