Permit: TC-MDP-0724-00798
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
1157 E GERRING ST
Address NEW:
1157 E GERRING ST
Apply Date:
08/16/2024
Applicant:
Mark Alteri
Description:
PV 1581SFR
Permit Reviews
Permit Number - TC-MDP-0724-00798
Permit Status: Complete
Permit Description: PV 1581SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/25/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 10/01/2024 | APPROVED |
| 01/15/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/16/2025 | APPROVED |
| 12/17/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/17/2024 | APPROVED |
| 08/22/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/29/2024 | REQUIRES RESUBMIT |
| 10/01/2024 | RESTAMP - RESIDENTIAL v.1 | 10/04/2024 | IN REVIEW |
| 10/04/2024 | RESTAMP - RESIDENTIAL v.2 | 10/07/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0724-00798
Permit Status: Complete
Permit Description: PV 1581SFR
| Date | Description | Comments |
|---|---|---|
| 08/28/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 08/28/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 08/28/2024 | Post-Tension Inspection Report is required. | |
| 07/12/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/12/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 10/07/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0724-00798
Permite Description: PV 1581SFR
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/31/2024 | COT - RSEL - Grounding/Bonding | N/A | Not Applicable | |
| 02/03/2025 | COT - RSPL - Gas Pressure Test | N/A | Re-inspection required | 2/3/25 see previous notes caulk all penetrations in vapor barrier garage |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0724-00798
Permit Description: PV 1581SFR
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/31/2024 | COT - RSEL - Electrical Underground | Passed | Passed 10/31/24 | |
| 10/31/2024 | COT - RSPL - Backwater Valve | Passed | Leak still present in kitchen sink, ground wet in other areas, unable to determine if leak or spillage from filling pipes 10/31/24 | |
| 10/31/2024 | COT - RSPL - Sewer | Passed | Corrections made 10/31/24 | |
| 10/31/2024 | COT - RSPL - Yard Water Line | Passed | Corrections made 10/31/24 | |
| 11/12/2024 | COT - RSBU - Preslab | Passed | 11/12/24. Address has been provided. Pass ok to pour. | |
| 11/12/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 11/12/24. Address has been provided. Pass ok to pour. | |
| 12/16/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 12/16/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 12/16/2024 | COT - RSPL - Rough Soil | Passed | ||
| 01/21/2025 | BULD - Electrical Clearance | Passed | ECO | |
| 02/05/2025 | COT - RSPL - Gas Pressure Test | Passed | 2/5/25 pass | |
| 02/07/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 02/14/2025 | COT - RSBU - Interior Shear Bracing | Passed | OK to insulate and cover walls | |
| 05/12/2025 | COT - BULD - SWG Clearance | Passed | 5/9/25: SWG CLEARANCE | |
| 06/10/2025 | ENGR Engineering Final | Passed | ||
| 07/07/2025 | COT - RSEL - Outdoor Lighting | Passed | 7-7-25: approved. | |
| 07/10/2025 | COT - RSME - Mechanical Final | Passed | ||
| 07/10/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 07/10/2025 | RSBU - Building Progress | Passed | ||
| 07/14/2025 | COT - RSEL - Electrical Final | Passed | 7-14-25: approved. | |
| 07/14/2025 | RSBU - Building Final | Passed | 7-14-25: previously inspected and approved. |