Inspection Status: Partial Pass
Inspection History: RSBU - Building Progress
| Date |
Description |
Inspector |
Results |
Comments |
| 01/22/2025 |
RSBU - Building Progress |
|
Partial Pass |
partial pass, ok to proceed to intermediate |
| 06/10/2025 |
RSBU - Building Progress |
|
Canceled |
|
| 07/07/2025 |
RSBU - Building Progress |
|
Re-inspection required |
7-7-25: missing knockouts at main panel, paint all exterior plastics, trim pressure relieve valve and install 90 degree fitting, label future solar panel breaker, exposed electrical box at island must have proper receptacle and cover, missing plate at 4 slot receptacle upstairs,mislabeled schedule at panel. |
| 07/10/2025 |
RSBU - Building Progress |
|
Passed |
|