Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
07/01/2024
Applicant:
Joshua Swinney
Description:
Harding SFR Model La Estancia (roof vent update)

Permit Reviews

Permit Number - TC-MDP-0724-00781
Permit Status: Inspections
Permit Description: Harding SFR Model La Estancia (roof vent update)
Start Date Submittal Complete Date Status  
07/12/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 07/23/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0724-00781
Permit Status: Inspections
Permit Description: Harding SFR Model La Estancia (roof vent update)
Total Outstanding Activity Conditions - 5
Date Name
07/08/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
07/17/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/17/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/17/2024 Post-Tension Inspection Report is required.
07/17/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0724-00781
Permit Status: Inspections
Permit Description: Harding SFR Model La Estancia (roof vent update)
Date Description Comments
07/23/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
07/08/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/17/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0724-00781
Permite Description: Harding SFR Model La Estancia (roof vent update)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/19/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 12/19/24 seal penetrations at vapor barriers, fire blocking between floors, nail plates required at 2x4's all wires running across gusset plates need to be strapped so that they are off of plates. Reinspection required

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0724-00781
Permit Description: Harding SFR Model La Estancia (roof vent update)
Total Completed Inspections - 12
Date Description Inspector Results Comments
10/01/2024 COT - BULD - SWG Clearance Passed
10/01/2024 COT - RSPL - Gas Pressure Test Passed
10/01/2024 COT - RSPL - Sewer Passed Plans will be revised on VTR and plumbing locations. Okay to proceed. Shading is required. 10/1/2024
10/01/2024 COT - RSEL - Electrical Underground Passed
10/01/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 10/1/2024
10/01/2024 COT - RSPL - Rough Soil Passed Plans will be revised on VTR and plumbing locations. Okay to proceed. Shading is required. 10/1/2024
10/08/2024 COT - RSEL - Grounding/Bonding Passed
10/08/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
10/08/2024 COT - RSBU - Preslab Passed
10/29/2024 COT - RSBU - Exterior Clips/Sheathing Passed 10-29-24, exterior clip/sheathing per approved plans. Okay to proceed with construction.
10/29/2024 COT - RSBU - Roof Nailing Passed 10-29-24, roof nailing per approved plans. Okay to proceed with construction.
12/19/2024 BULD - Electrical Clearance Passed 12/19/4 TEP clearance code: ECO

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BLOCK 6 LOT 19 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LA ESTANCIA BLOCK 6 LOT 19 FINAL SIC-2024-07-11_V1.PDF DOCUMENTS VIEW