Permit: TC-MDP-0724-00781
Permit Details
Apply Date:
07/01/2024
Applicant:
Joshua Swinney
Description:
Harding SFR Model La Estancia (roof vent update)
Permit Reviews
Permit Number - TC-MDP-0724-00781
Permit Status: Inspections
Permit Description: Harding SFR Model La Estancia (roof vent update)
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/12/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 07/23/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0724-00781
Permit Status: Inspections
Permit Description: Harding SFR Model La Estancia (roof vent update)
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
07/08/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
07/17/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
07/17/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
07/17/2024 | Post-Tension Inspection Report is required. |
07/17/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0724-00781
Permit Status: Inspections
Permit Description: Harding SFR Model La Estancia (roof vent update)
Date | Description | Comments |
---|---|---|
07/23/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
07/08/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
07/17/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0724-00781
Permite Description: Harding SFR Model La Estancia (roof vent update)
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/19/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 12/19/24 seal penetrations at vapor barriers, fire blocking between floors, nail plates required at 2x4's all wires running across gusset plates need to be strapped so that they are off of plates. Reinspection required |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0724-00781
Permit Description: Harding SFR Model La Estancia (roof vent update)
Total Completed Inspections - 12
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/01/2024 | COT - BULD - SWG Clearance | Passed | ||
10/01/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
10/01/2024 | COT - RSPL - Sewer | Passed | Plans will be revised on VTR and plumbing locations. Okay to proceed. Shading is required. 10/1/2024 | |
10/01/2024 | COT - RSEL - Electrical Underground | Passed | ||
10/01/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 10/1/2024 | |
10/01/2024 | COT - RSPL - Rough Soil | Passed | Plans will be revised on VTR and plumbing locations. Okay to proceed. Shading is required. 10/1/2024 | |
10/08/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
10/08/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
10/08/2024 | COT - RSBU - Preslab | Passed | ||
10/29/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | 10-29-24, exterior clip/sheathing per approved plans. Okay to proceed with construction. | |
10/29/2024 | COT - RSBU - Roof Nailing | Passed | 10-29-24, roof nailing per approved plans. Okay to proceed with construction. | |
12/19/2024 | BULD - Electrical Clearance | Passed | 12/19/4 TEP clearance code: ECO |