Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-0724-00781
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/19/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 12/19/24 seal penetrations at vapor barriers, fire blocking between floors, nail plates required at 2x4's all wires running across gusset plates need to be strapped so that they are off of plates. Reinspection required | |
12/24/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 12/19/24 seal penetrations at vapor barriers, fire blocking between floors, nail plates required at 2x4's all wires running across gusset plates need to be strapped so that they are off of plates. Reinspection required 12/24/24: Seal all penetrations through top plate and vapor barrier, insulation in walls must be removed to ensure all penetrations through vapor barrier have been sealed throughout. STOPPED INSPECTION COULD NOT CONTINUE INSPECTIONS DUE TO INSULATION COVERING WALLS. |
|
12/27/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 12/27/24 corrections made |