Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
08/08/2023
Applicant:
Mark Alteri
Description:
PVCS1500 T22-M0040 SFR

Permit Reviews

Permit Number - TC-MDP-0723-01260
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Start Date Submittal Complete Date Status  
08/09/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/11/2023 APPROVED Review Details
10/17/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/17/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0723-01260
Permit Status: Complete
Permit Description: PVCS1500 T22-M0040 SFR
Date Description Comments
08/09/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/17/2023 Post-Tension Inspection Report is required.
08/09/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/11/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0723-01260
Permite Description: PVCS1500 T22-M0040 SFR
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
12/14/2023 COT - RSPL - Gas Pressure Test N/A Canceled Canceled per contractor. 12/14/2023
12/14/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Canceled Canceled per contractor. 12/14/2023

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0723-01260
Permit Description: PVCS1500 T22-M0040 SFR
Total Completed Inspections - 23
Date Description Inspector Results Comments
09/01/2023 COT - RSPL - Backwater Valve Passed
09/01/2023 COT - RSPL - Rough Soil Passed
09/01/2023 COT - RSPL - Sewer Passed
09/08/2023 COT - RSEL - Electrical Underground Passed 9/8/23 passed per letter photo attached
09/08/2023 COT - RSBU - Excavation/Rebar/Zoning Passed 9/8/23 passed per letter
09/08/2023 COT - RSBU - Preslab Passed 9/8/23 passed per letter photo attached
09/08/2023 COT - RSEL - Grounding/Bonding Passed 9/8/23 passed per letter
10/09/2023 COT - RSBU - Exterior Clips/Sheathing Passed
10/09/2023 COT - RSBU - Roof Nailing Passed
11/21/2023 COT - RSBU - Interior Shear Bracing Passed
12/11/2023 BULD - Electrical Clearance Passed TEP ECO
12/19/2023 COT - RSPL - Gas Pressure Test Passed
12/20/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12/20/23: Penetration in garage has been fire foamed. Gas line has been attached to Ufer ground. Anchor bolts have been added in shear wall of master bedroom. Okay to proceed with insulation and drywall installation.
01/10/2024 COT - RSBU - Firewall/Fire Barrier/Firestop Passed
03/27/2024 COT - BULD - SWG Clearance Passed
03/27/2024 COT - RSEL - Outdoor Lighting Passed
03/27/2024 RSBU - Building Progress Passed
03/27/2024 ENGR Engineering Final Passed
04/01/2024 COT - RSEL - Electrical Final Passed 4-1-24: Construction, mechanical, plumbing, and electrical are complete. Mechanical, plumbing, and electrical fixtures are installed and operational. AFCI breakers are installed in electrical panel for all circuits. GFCI outlets are installed in kitchen, laundry, bathrooms, and garage. Okay to issue Certificate of Occupancy once all other departments have signed off permit.
04/01/2024 COT - RSME - Mechanical Final Passed 4-1-24: Construction, mechanical, plumbing, and electrical are complete. Mechanical, plumbing, and electrical fixtures are installed and operational. AFCI breakers are installed in electrical panel for all circuits. GFCI outlets are installed in kitchen, laundry, bathrooms, and garage. Okay to issue Certificate of Occupancy once all other departments have signed off permit.
04/01/2024 COT - RSPL - Plumbing Final Passed 4-1-24: Construction, mechanical, plumbing, and electrical are complete. Mechanical, plumbing, and electrical fixtures are installed and operational. AFCI breakers are installed in electrical panel for all circuits. GFCI outlets are installed in kitchen, laundry, bathrooms, and garage. Okay to issue Certificate of Occupancy once all other departments have signed off permit.
04/01/2024 COT - RSPL - Yard Water Line Passed 4/1/24: Water riser has been moved to the front corner of garage on side of house.
04/01/2024 RSBU - Building Final Passed 4-1-24: Construction, mechanical, plumbing, and electrical are complete. Mechanical, plumbing, and electrical fixtures are installed and operational. AFCI breakers are installed in electrical panel for all circuits. GFCI outlets are installed in kitchen, laundry, bathrooms, and garage. Okay to issue Certificate of Occupancy once all other departments have signed off permit.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
PT REPORT LOT 69-2023-10-17_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CBT 69 PP FOR PERMIT_V1.PDF DOCUMENTS VIEW
CBT 69 PT CERT-2023-08-08_V1.PDF DOCUMENTS VIEW