Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
Permit Number - TC-MDP-0723-01260
Inspection Description - RSBU - Building Final
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/27/2024 | RSBU - Building Final | Re-inspection required | Water heater not installed, bottom breaker at electrical panel not labeled, toilet not installed, no plans on site. House is not ready for final. Stopped inspection. More items may be added. | |
04/01/2024 | RSBU - Building Final | Passed | 4-1-24: Construction, mechanical, plumbing, and electrical are complete. Mechanical, plumbing, and electrical fixtures are installed and operational. AFCI breakers are installed in electrical panel for all circuits. GFCI outlets are installed in kitchen, laundry, bathrooms, and garage. Okay to issue Certificate of Occupancy once all other departments have signed off permit. |