Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
07/14/2023
Applicant:
Description:
1362 Corazon Del Pueblo

Permit Reviews

Permit Number - TC-MDP-0723-01244
Permit Status: Complete
Permit Description: 1362 Corazon Del Pueblo
Start Date Submittal Complete Date Status  
07/14/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.1 07/18/2023 REQUIRES RESUBMIT Review Details
08/03/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.2 08/07/2023 APPROVED Review Details
06/04/2026 SPECIAL INSPECTION REVIEW v.1 06/04/2026 APPROVED Review Details
01/29/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/30/2024 APPROVED Review Details
08/07/2023 RESTAMP - RESIDENTIAL v.1 08/07/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0723-01244
Permit Status: Complete
Permit Description: 1362 Corazon Del Pueblo
Date Description Comments
05/01/2023 Post-Tension Inspection Report is required.
07/07/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/01/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0723-01244
Permite Description: 1362 Corazon Del Pueblo
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
04/21/2026 COT - RSEL - Electrical Underground N/A Not Applicable
04/21/2026 COT - BULD - SWG Clearance N/A Not Applicable
04/21/2026 COT - RSPL - Gas Pressure Test N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0723-01244
Permit Description: 1362 Corazon Del Pueblo
Total Completed Inspections - 18
Date Description Inspector Results Comments
03/05/2024 COT - RSPL - Rough Soil Passed
03/05/2024 COT - RSPL - Sewer Passed
03/06/2024 COT - RSPL - Yard Water Line Passed Not ready
3/6/24: YWL per plan ok to backfill. Shading required
04/08/2024 COT - RSBU - Preslab Passed
04/08/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
04/08/2024 COT - RSEL - Grounding/Bonding Passed
08/16/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 8/16/2024
09/18/2024 COT - RSBU - Roof Nailing Passed Roof nailing approved.
10/04/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
10/30/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 10-30-24, intermediates approved. Okay to continue with construction.
11/13/2024 COT - RSBU - Interior Shear Bracing Passed 11-13-24, shear wall bracing approved. Okay to tape and texture drywall.
01/22/2025 COT - RSPL - Plumbing Final Passed 1/22/25 pass
01/22/2025 COT - RSME - Mechanical Final Passed 1/22/25 pass
01/22/2025 COT - RSEL - Outdoor Lighting Passed 1/22/25 pass
01/22/2025 COT - RSEL - Electrical Final Passed 1/22/25 pass
01/22/2025 RSBU - Building Final Passed 1/22/25 pass
01/23/2025 ENGR Engineering Final Passed CO Ready
04/21/2026 RSBU - Building Progress Passed

Documents

File Name Document Type  
220583-G CORAZON DEL PUEBLO LOT 373-2026-06-03_V1.PDF DOCUMENTS VIEW
COFO_FINALCOFO_RESIDENTIAL (SSRS).PDF DOCUMENTS VIEW
R83165417.HABITAT-1362_V2.PDF DOCUMENTS VIEW
LAYOUT B[15715]_V1.PDF DOCUMENTS VIEW
MODEL 1362 FLOOR - LOWER ROOF ELEV. B (STAMPED)[15667]_V1.PDF DOCUMENTS VIEW
MODEL 1362 ROOF CALCS STAMPED[15719]_V1.PDF DOCUMENTS VIEW
TOP ROOF LAYOUT[15714]_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
HABITAT MODEL 1362 6650 S. AVENIDA DEL ARRABAL PLOT PLAN 373 7.25.23_V2.PDF DOCUMENTS VIEW
GC LETTER FOR COT_V1.PDF DOCUMENTS VIEW