Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/22/2025 | ENGR Engineering Final | Not Ready | 1) plot plan is needed to show drainage. 2) perimeter walls needs to be finished landscaping on the outside of the wall. |
|
| 01/23/2025 | ENGR Engineering Final | Passed | CO Ready |