Permit: TC-MDP-0626-00472
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
6259 S BLUE ANGELS AV
Address NEW:
6259 S BLUE ANGELS AV
Apply Date:
06/30/2026
Applicant:
Celina Rodriguez
Description:
Cielo Reserves New SFR Model 1465-130 (2024 IRC) (Model Master Plan TC-MDP-0526-00347)
Permit Reviews
Permit Number - TC-MDP-0626-00472
Permit Status: Inspections
Permit Description: Cielo Reserves New SFR Model 1465-130 (2024 IRC) (Model Master Plan TC-MDP-0526-00347)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/08/2026 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 07/10/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0626-00472
Permit Status: Inspections
Permit Description: Cielo Reserves New SFR Model 1465-130 (2024 IRC) (Model Master Plan TC-MDP-0526-00347)
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 06/18/2026 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. |
| 06/18/2026 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 07/10/2026 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 07/10/2026 | Post-Installed Anchor Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0626-00472
Permit Status: Inspections
Permit Description: Cielo Reserves New SFR Model 1465-130 (2024 IRC) (Model Master Plan TC-MDP-0526-00347)
| Date | Description | Comments |
|---|---|---|
| 07/10/2026 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 06/18/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 06/18/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0626-00472
Permit Description: Cielo Reserves New SFR Model 1465-130 (2024 IRC) (Model Master Plan TC-MDP-0526-00347)
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2026 | COT - RSPL - Rough Soil | Passed | 07/21/2026 Holding under test - ok to backfill, shading required. |
|
| 07/21/2026 | COT - RSPL - Sewer | Passed | 07/21/2026 Holding under test with green tracer wire to HCS - ok to backfill, shading required. |
|
| 07/21/2026 | COT - RSPL - Yard Water Line | Passed | 07/21/2026 Holding under test with blue tracer wire - ok to backfill, shading required. |
|
| 07/21/2026 | COT - RSPL - Backwater Valve | Passed | ||
| 07/29/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 07/29/2026 Approved per plan and reinforcement. Okay to pour concrete. |
|
| 07/29/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 07/29/2026 | COT - RSBU - Preslab | Passed | 07/29/2026 Approved per plan and reinforcement. Okay to pour concrete. |
|
| 08/06/2026 | COT - RSBU - Roof Nailing | Passed | ||
| 08/07/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 8-7-26 all corrections have been made. | |
| 08/18/2026 | COT - RSPL - Gas Pressure Test | Passed | 8-18-26: gas pressure test approved. | |
| 08/18/2026 | RSBU - Building Progress | Passed | 8-18-26: gas pressure test approved. | |
| 08/24/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 8-24-26 all items are being corrected. OK to insulate. | |
| 08/31/2026 | BULD - Electrical Clearance | Passed | 8-31-26 ECO clearance approved | |
| 08/31/2026 | COT - RSBU - Interior Shear Bracing | Passed | 8-31-26 OK to proceed | |
| 10/05/2026 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. 10/5/2026 |