Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/18/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 8-18-26: ground coach light, seal penetrations at garage shear wall, provide a support above ceiling at laundry flex exhaust, seal vapor barrier at bedroom / fire foam top plate penetration at marked location, fire foam low voltage top plate penetration at great room, secure condensation lines using a listed means of support-not nails, add a bank plate at marked location of great room, fire foam top plate penetrations at marked locations of primary bedroom, seal vapor barrier penetrations above ceiling at primary bedroom, provide a support for flex duct at marked location of great room, fire foam between fha plates at kitchen hood. Stopped inspection-additional items may be noted. | |
| 08/19/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 8.19.26 1. Flex line called out on previous inspection has not been corrected 2. Supports for condensate lines have not been corrected. |
|
| 08/21/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Canceled | 8-21-26 canceled unable to conduct thorough reinspect due to insulators insulating | |
| 08/24/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 8-24-26 all items are being corrected. OK to insulate. |