Permit: TC-MDP-0626-00442
Permit Details
Status:
Needs Resubmittal
Type:
Model Building Permit
Address:
9568 E MEOLA DR
Address NEW:
9568 E MEOLA DR
Apply Date:
06/18/2026
Applicant:
Celina Rodriguez
Description:
Mirador Point 2467-225 (2024 IRC) (Model Master Plan TC-MDP-0226-00092)
Permit Reviews
Permit Number - TC-MDP-0626-00442
Permit Status: Needs resubmittal
Permit Description: Mirador Point 2467-225 (2024 IRC) (Model Master Plan TC-MDP-0226-00092)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/25/2026 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 07/02/2026 | APPROVED |
| 11/10/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/12/2026 | APPROVED |
| 11/12/2026 | SPECIAL INSPECTION REVIEW v.1 | 11/13/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-0626-00442
Permit Status: Needs resubmittal
Permit Description: Mirador Point 2467-225 (2024 IRC) (Model Master Plan TC-MDP-0226-00092)
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 06/16/2026 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 06/30/2026 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 06/30/2026 | Post-Installed Anchor Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0626-00442
Permit Status: Needs resubmittal
Permit Description: Mirador Point 2467-225 (2024 IRC) (Model Master Plan TC-MDP-0226-00092)
| Date | Description | Comments |
|---|---|---|
| 06/16/2026 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. | |
| 06/16/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 06/16/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Needs Resubmittal
Permit Number: TC-MDP-0626-00442
Permite Description: Mirador Point 2467-225 (2024 IRC) (Model Master Plan TC-MDP-0226-00092)
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/10/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 11/10/2026 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 11/12/2026 | ENGR Engineering Final | N/A | Partial Pass | 11-12-26 All items have been corrected, pending outstanding conditions to be satisfied upon approval |
| 11/12/2026 | RSBU - Building Final | N/A | Partial Pass | 11-12-26 all outstanding conditions are required to be satisfied upon approval |
Completed Inspections
Permit Status: Needs Resubmittal
Permit Number: TC-MDP-0626-00442
Permit Description: Mirador Point 2467-225 (2024 IRC) (Model Master Plan TC-MDP-0226-00092)
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/08/2026 | COT - RSPL - Sewer | Passed | 07/08/2026 Holding under test. Ok to backfill. Backwater valve installed per site plan. |
|
| 07/08/2026 | COT - RSPL - Rough Soil | Passed | 07/08/2026 Holding under test. Ok to backfill. |
|
| 07/08/2026 | COT - RSPL - Yard Water Line | Passed | 07/08/2026 Holding under test. Ok to backfill. |
|
| 07/16/2026 | COT - RSBU - Preslab | Passed | 07/16/2026 Approved per plan and reinforcement. Okay to pour. |
|
| 07/16/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 07/16/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 08/21/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 8-21-26 All items have been corrected. OK to continue. | |
| 08/21/2026 | COT - RSBU - Roof Nailing | Passed | 8-21-26 All items have been corrected. OK to continue | |
| 09/08/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 9-8-26 all corrections were made OK to proceed | |
| 09/17/2026 | COT - RSBU - Interior Shear Bracing | Passed | 9-17-26 all corrections were made at the time of the inspection OK to proceed | |
| 10/15/2026 | BULD - Electrical Clearance | Passed | 10/15/2026 Clearance TEP ECO. |
|
| 11/10/2026 | COT - RSEL - Electrical Final | Passed | 11-10-26 Electrical final approved | |
| 11/10/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 11/10/2026 | COT - RSPL - Backwater Valve | Passed | ||
| 11/10/2026 | COT - RSPL - Plumbing Final | Passed | 11-10-26 plumbing final approved | |
| 11/10/2026 | RSBU - Building Progress | Passed | ||
| 11/12/2026 | COT - RSME - Mechanical Final | Passed | 11-12-26 all items have been corrected mechanical final approved |