Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
2181 E SUPERSONIC ST
Apply Date:
12/29/2025
Applicant:
Description:
Cielo Reserve 1465 SFR (Model master plan TC-MDP-0525-00294)

Permit Reviews

Permit Number - TC-MDP-0625-00366
Permit Status: Inspections complete
Permit Description: Cielo Reserve 1465 SFR (Model master plan TC-MDP-0525-00294)
Start Date Submittal Complete Date Status  
01/16/2026 ADMINISTRATIVE v.2 01/16/2026 APPROVED Review Details
01/09/2026 ADMINISTRATIVE v.1 01/09/2026 REQUIRES RESUBMIT Review Details
12/29/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 12/29/2025 REQUIRES RESUBMIT Review Details
12/30/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.2 01/09/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0625-00366
Permit Status: Inspections complete
Permit Description: Cielo Reserve 1465 SFR (Model master plan TC-MDP-0525-00294)
Total Outstanding Activity Conditions - 4
Date Name
06/23/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/23/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
12/31/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
12/31/2025 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.

Conditions

Permit Number - TC-MDP-0625-00366
Permit Status: Inspections complete
Permit Description: Cielo Reserve 1465 SFR (Model master plan TC-MDP-0525-00294)
Date Description Comments
06/23/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
06/23/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0625-00366
Permit Description: Cielo Reserve 1465 SFR (Model master plan TC-MDP-0525-00294)
Total Completed Inspections - 21
Date Description Inspector Results Comments
01/27/2026 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required. 1/27/2026
01/27/2026 COT - RSPL - Sewer Passed Okay to backfill. Shading required. 1/27/2026
01/27/2026 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 1/27/2026
02/03/2026 COT - RSBU - Excavation/Rebar/Zoning Passed 2.3.26
Approved
02/03/2026 COT - RSBU - Preslab Passed 2.3.26
Approved
02/03/2026 COT - RSEL - Electrical Underground Passed
02/10/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 02/10/2026
Approved. Added anchor bolts at marked locations and cs16 strap to notched top plate.
02/10/2026 COT - RSBU - Roof Nailing Passed
02/25/2026 BULD - Electrical Clearance Passed Clearance for TEP ECO. 2/25/2026
02/25/2026 COT - RSEL - Grounding/Bonding Passed
02/25/2026 COT - RSPL - Gas Pressure Test Passed
02/25/2026 RSBU - Building Progress Passed
02/27/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 02/27/2026
All corrections made to 2/26/26 inspection.
03/10/2026 COT - RSBU - Interior Shear Bracing Passed
04/20/2026 COT - BULD - SWG Clearance Passed 04/20/2026
Approved clearance Southwest Gas.
04/29/2026 COT - RSEL - Electrical Final Passed
04/29/2026 COT - RSEL - Outdoor Lighting Passed
04/29/2026 COT - RSME - Mechanical Final Passed
04/29/2026 COT - RSPL - Plumbing Final Passed
04/29/2026 ENGR Engineering Final Passed Site is complete in accordancei with approved plans.
04/29/2026 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CIELO RESERVE - LOT 45 START_V1.PDF DOCUMENTS VIEW
CR 45 SIC-2025-12-23_V1.PDF DOCUMENTS VIEW