Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/25/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Seal all penetration through lath at marked areas in red. Move over receptacle near range. Secure electrical box near SGD and at entry. Secure gas line in place at attic area near shit off valve. Add support to gas line underneath attic platform. Seal all tares in duct work. 2/26/2026 | |
| 02/27/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 02/27/2026 All corrections made to 2/26/26 inspection. |