Permit: TC-MDP-0625-00361
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
6211 S BLUE ANGELS AV
Address NEW:
6211 S BLUE ANGELS AV
Apply Date:
07/17/2025
Applicant:
Description:
Cielo Reserve 1465 SFR (Model master plan TC-MDP-0525-00294)
Permit Reviews
Permit Number - TC-MDP-0625-00361
Permit Status: Inspections
Permit Description: Cielo Reserve 1465 SFR (Model master plan TC-MDP-0525-00294)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/29/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 07/30/2025 | APPROVED |
| 07/18/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 07/25/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-0625-00361
Permit Status: Inspections
Permit Description: Cielo Reserve 1465 SFR (Model master plan TC-MDP-0525-00294)
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 06/23/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 06/23/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
| 07/22/2025 | Post-Installed Anchor Inspection Report is required. |
| 07/22/2025 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0625-00361
Permit Status: Inspections
Permit Description: Cielo Reserve 1465 SFR (Model master plan TC-MDP-0525-00294)
| Date | Description | Comments |
|---|---|---|
| 06/23/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 06/23/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0625-00361
Permite Description: Cielo Reserve 1465 SFR (Model master plan TC-MDP-0525-00294)
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/10/2025 | ENGR Engineering Final | N/A | Not Ready | To many incomplete items for Engineering Final to be complete. Landscape is unfinished, utilities are incomplete, home has no safe access. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0625-00361
Permit Description: Cielo Reserve 1465 SFR (Model master plan TC-MDP-0525-00294)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/04/2025 | COT - RSPL - Sewer | Passed | 8.24.25 Approved |
|
| 08/04/2025 | COT - RSPL - Rough Soil | Passed | 8.24.25 Approved |
|
| 08/04/2025 | COT - RSPL - Backwater Valve | Passed | 8.24.25 Approved |
|
| 08/06/2025 | COT - RSEL - Electrical Underground | Passed | 8-6-25: approved. | |
| 08/06/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 8-6-25: preslab, excavation, reinforcement and setbacks verified per plans. Okay to pour concrete. | |
| 08/11/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 8.11.25 H25 verified Rsp4 verified Bracing verified Straps verified Hold downs verified Interior pins verified Approved |
|
| 08/11/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 08/15/2025 | COT - RSPL - Gas Pressure Test | Passed | 8.15.25 Approved |
|
| 08/15/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 8.15.25 Electrical verified Mechanical verified Plumbing verified Water under air test verified at gauge Gas pressure verified at gauge Smokies verified Small penetrations to vapor barrier sealed while on site Tstat verified APPROVED |
|
| 08/15/2025 | COT - RSEL - Grounding/Bonding | Passed | 8.15.25 Approved |
|
| 08/18/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 09/09/2025 | BULD - Electrical Clearance | Passed | 9-9-25: okay to energize panel. ECO clearance issued to TEP. | |
| 09/09/2025 | COT - RSPL - Yard Water Line | Passed | 9-9-25: meter not installed yet. Will be verified at later date. | |
| 09/09/2025 | COT - RSBU - Preslab | Passed | 9-9-25: preslab approved. Note: submit a revised site/electrical plan showing ufer/panel at changed location. |
|
| 09/10/2025 | COT - BULD - SWG Clearance | Passed | 9-10-25: okay to install meter. Clearance issued to SWG. | |
| 09/10/2025 | COT - RSEL - Electrical Final | Passed | 9-10-25: electrical final approved. | |
| 09/10/2025 | COT - RSEL - Outdoor Lighting | Passed | 9-10-25: outdoor lighting approved. | |
| 09/10/2025 | COT - RSME - Mechanical Final | Passed | 9-10-25: mechanical final approved. | |
| 09/10/2025 | COT - RSPL - Plumbing Final | Passed | 9-10-25: plumbing final approved. | |
| 09/10/2025 | RSBU - Building Final | Passed | 9-10-25: building final approved on model home. Note: no running water, waiting on Pima County sewer approval & an updated site/electrical plan showing change on ufer/panel location. |
|
| 09/10/2025 | RSBU - Building Progress | Passed |